YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Dynamic Systems, Measurement, and Control
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Dynamic Systems, Measurement, and Control
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Boiler Implosion Control in Fossil Fuel Power Plants

    Source: Journal of Dynamic Systems, Measurement, and Control:;1985:;volume( 107 ):;issue: 004::page 267
    Author:
    S. Z. Wu
    ,
    D. N. Wormley
    ,
    D. Rowell
    ,
    P. Griffith
    DOI: 10.1115/1.3140734
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: An evaluation of systems for control of fossil fuel power plant boiler and stack implosions has been performed using computer simulation techniques described in a companion paper. The simulations have shown that forced and induced draft fan control systems and induced draft fan bypass systems reduce the furnace pressure excursions significantly following a main fuel trip. The limitations of these systems are associated with actuator range and response time and stack pressure excursions during control actions. Preliminary study suggests that an alternative control solution may be achieved by discharging steam into the furnace after a fuel trip.
    • Download: (343.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Boiler Implosion Control in Fossil Fuel Power Plants

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/99574
    Collections
    • Journal of Dynamic Systems, Measurement, and Control

    Show full item record

    contributor authorS. Z. Wu
    contributor authorD. N. Wormley
    contributor authorD. Rowell
    contributor authorP. Griffith
    date accessioned2017-05-08T23:19:47Z
    date available2017-05-08T23:19:47Z
    date copyrightDecember, 1985
    date issued1985
    identifier issn0022-0434
    identifier otherJDSMAA-26089#267_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/99574
    description abstractAn evaluation of systems for control of fossil fuel power plant boiler and stack implosions has been performed using computer simulation techniques described in a companion paper. The simulations have shown that forced and induced draft fan control systems and induced draft fan bypass systems reduce the furnace pressure excursions significantly following a main fuel trip. The limitations of these systems are associated with actuator range and response time and stack pressure excursions during control actions. Preliminary study suggests that an alternative control solution may be achieved by discharging steam into the furnace after a fuel trip.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleBoiler Implosion Control in Fossil Fuel Power Plants
    typeJournal Paper
    journal volume107
    journal issue4
    journal titleJournal of Dynamic Systems, Measurement, and Control
    identifier doi10.1115/1.3140734
    journal fristpage267
    journal lastpage269
    identifier eissn1528-9028
    treeJournal of Dynamic Systems, Measurement, and Control:;1985:;volume( 107 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian