YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Decision Support Model for Determining Cost-Effective Renovation Time 

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 003
    Author(s): Kyuman Cho; Yoojung Yoon
    Publisher: American Society of Civil Engineers
    Request PDF

    Time and Cost–Optimized Decision Support Model for Fast-Track Projects 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 001
    Author(s): Kyuman Cho; Makarand Hastak
    Publisher: American Society of Civil Engineers
    Abstract: The fast-track method is one of the most recognized methodologies for reducing construction project schedules. However, due to the lack of definitive research to date pertaining to the effects of fast-track application in ...
    Request PDF

    Method for Generating Multiple MRR Solutions for Application in Cost-Leveling Models 

    Source: Journal of Infrastructure Systems:;2017:;Volume ( 023 ):;issue: 003
    Author(s): Yoojung Yoon; Makarand Hastak; Kyuman Cho
    Publisher: American Society of Civil Engineers
    Request PDF

    Integrated Schedule and Cost Model for Repetitive Construction Process 

    Source: Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 002
    Author(s): Kyuman Cho; Taehoon Hong; Changtaek Hyun
    Publisher: American Society of Civil Engineers
    Abstract: Several efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site ...
    Request PDF

    Assessment of Critical Construction Engineering and Management Aspects of Nuclear Power Projects 

    Source: Journal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 004
    Author(s): Erik R. Wright; Kyuman Cho; Makarand Hastak
    Publisher: American Society of Civil Engineers
    Abstract: Thirty years ago when the last nuclear power plant was ordered in the United States, many nuclear projects were suffering from large cost and schedule overruns, which were often caused by poor project management practices ...
    Request PDF

    Assessment of the U.S. Nuclear Construction Industry in Terms of Human Capital and Construction Technologies 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 004
    Author(s): Erik R. Wright; Kyuman Cho; Makarand Hastak
    Publisher: American Society of Civil Engineers
    Request PDF

    Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006
    Author(s): Taehoon Hong; Kyuman Cho; Changtaek Hyun; Seungwoo Han
    Publisher: American Society of Civil Engineers
    Abstract: Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, ...
    Request PDF

    Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 002
    Author(s): Kyuman Cho; Taehoon Kim; Taehoon Hong
    Publisher: ASCE
    Abstract: Despite frequent reports of work delays in renovation projects due to inherent characteristics, such as difficulties in diagnosing the status of existing buildings, studies addressing this issue are lacking. Therefore, ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian