YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 002
    Author:
    Kyuman Cho
    ,
    Taehoon Kim
    ,
    Taehoon Hong
    DOI: 10.1061/(ASCE)ME.1943-5479.0000732
    Publisher: ASCE
    Abstract: Despite frequent reports of work delays in renovation projects due to inherent characteristics, such as difficulties in diagnosing the status of existing buildings, studies addressing this issue are lacking. Therefore, this study aims to develop a new method to predict the delay probabilities of renovations according to the attributes of the renovation projects. To achieve this objective, with focus on the inherent factors of renovation projects, two core concepts are established: (1) risk probability according to project attribute; and (2) delay probability for renovation depending on risk probability. By performing case studies on four actual projects, the probabilities of risk factors for each project were confirmed based on project attributes; furthermore, delay probabilities for the renovations of each project were accurately estimated. Thus, this research is expected to assist real estate investors in selecting potential buildings for investment by considering inherent risk factors and delay probabilities owing to renovations.
    • Download: (559.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266050
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKyuman Cho
    contributor authorTaehoon Kim
    contributor authorTaehoon Hong
    date accessioned2022-01-30T19:49:48Z
    date available2022-01-30T19:49:48Z
    date issued2020
    identifier other%28ASCE%29ME.1943-5479.0000732.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266050
    description abstractDespite frequent reports of work delays in renovation projects due to inherent characteristics, such as difficulties in diagnosing the status of existing buildings, studies addressing this issue are lacking. Therefore, this study aims to develop a new method to predict the delay probabilities of renovations according to the attributes of the renovation projects. To achieve this objective, with focus on the inherent factors of renovation projects, two core concepts are established: (1) risk probability according to project attribute; and (2) delay probability for renovation depending on risk probability. By performing case studies on four actual projects, the probabilities of risk factors for each project were confirmed based on project attributes; furthermore, delay probabilities for the renovations of each project were accurately estimated. Thus, this research is expected to assist real estate investors in selecting potential buildings for investment by considering inherent risk factors and delay probabilities owing to renovations.
    publisherASCE
    titleEstimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes
    typeJournal Paper
    journal volume36
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000732
    page04019040
    treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian