Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise BuildingSource: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006DOI: 10.1061/(ASCE)CO.1943-7862.0000300Publisher: American Society of Civil Engineers
Abstract: Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase.
|
Show full item record
contributor author | Taehoon Hong | |
contributor author | Kyuman Cho | |
contributor author | Changtaek Hyun | |
contributor author | Seungwoo Han | |
date accessioned | 2017-05-08T21:39:19Z | |
date available | 2017-05-08T21:39:19Z | |
date copyright | June 2011 | |
date issued | 2011 | |
identifier other | %28asce%29co%2E1943-7862%2E0000306.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58456 | |
description abstract | Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase. | |
publisher | American Society of Civil Engineers | |
title | Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building | |
type | Journal Paper | |
journal volume | 137 | |
journal issue | 6 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)CO.1943-7862.0000300 | |
tree | Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006 | |
contenttype | Fulltext |