YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006
    Author:
    Taehoon Hong
    ,
    Kyuman Cho
    ,
    Changtaek Hyun
    ,
    Seungwoo Han
    DOI: 10.1061/(ASCE)CO.1943-7862.0000300
    Publisher: American Society of Civil Engineers
    Abstract: Many existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase.
    • Download: (166.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58456
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTaehoon Hong
    contributor authorKyuman Cho
    contributor authorChangtaek Hyun
    contributor authorSeungwoo Han
    date accessioned2017-05-08T21:39:19Z
    date available2017-05-08T21:39:19Z
    date copyrightJune 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000306.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58456
    description abstractMany existing studies about construction schedule management focus on the planning phase of a project, particularly on schedule estimation based on the labor resources involved in the project. However, equipment resources, which are another crucial factor in the productivity of a construction project, have not been considered in existing research. Therefore, this study aimed to develop a schedule estimation model considering both labor and equipment resources. For the purpose of this study, core wall construction was selected because it is a very important construction activity in terms of schedule estimation for high-rise building construction. To develop a schedule estimation model for core wall construction, an in-depth case study was conducted. On the basis of the results of the case study, a simulation model was developed using the CYCLONE method. Finally, by using the results of the simulation, a schedule estimation model for core wall construction was developed by conducting multiple-regression analysis. By using the developed model, a project manager can easily, quickly, and accurately perform schedule estimation when there are problems that may cause construction schedule delays during the construction phase.
    publisherAmerican Society of Civil Engineers
    titleSimulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building
    typeJournal Paper
    journal volume137
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000300
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian