description abstract | Several efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site using such a model. The integrated schedule and cost model developed in this study (1) enables the planning and control of repetitive construction processes and (2) can be used by a project manager in an actual construction site. Furthermore, an integrated schedule and cost model for the core wall construction, which is an important repetitive process in the recently booming high-rise building construction in terms of scheduling, was developed using the integration model developed in this study. It is expected that the integrated schedule and cost model developed can allow project managers to integrate the schedule and cost of repetitive construction processes more effectively and support the project managers’ decision-making. | |
publisher | American Society of Civil Engineers | |
title | Integrated Schedule and Cost Model for Repetitive Construction Process | |
type | Journal Paper | |
journal volume | 26 | |
journal issue | 2 | |
journal title | Journal of Management in Engineering | |
identifier doi | 10.1061/(ASCE)ME.1943-5479.0000009 | |
tree | Journal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 002 | |
contenttype | Fulltext | |