contributor authorKyuman Cho
contributor authorTaehoon Hong
contributor authorChangtaek Hyun
date accessioned2017-05-08T21:54:26Z
date available2017-05-08T21:54:26Z
date copyrightApril 2010
date issued2010
identifier other%28asce%29me%2E1943-5479%2E0000044.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66072
description abstractSeveral efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site using such a model. The integrated schedule and cost model developed in this study (1) enables the planning and control of repetitive construction processes and (2) can be used by a project manager in an actual construction site. Furthermore, an integrated schedule and cost model for the core wall construction, which is an important repetitive process in the recently booming high-rise building construction in terms of scheduling, was developed using the integration model developed in this study. It is expected that the integrated schedule and cost model developed can allow project managers to integrate the schedule and cost of repetitive construction processes more effectively and support the project managers’ decision-making.
publisherAmerican Society of Civil Engineers
titleIntegrated Schedule and Cost Model for Repetitive Construction Process
typeJournal Paper
journal volume26
journal issue2
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000009
treeJournal of Management in Engineering:;2010:;Volume ( 026 ):;issue: 002
contenttypeFulltext