YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time and Cost–Optimized Decision Support Model for Fast-Track Projects

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 001
    Author:
    Kyuman Cho
    ,
    Makarand Hastak
    DOI: 10.1061/(ASCE)CO.1943-7862.0000570
    Publisher: American Society of Civil Engineers
    Abstract: The fast-track method is one of the most recognized methodologies for reducing construction project schedules. However, due to the lack of definitive research to date pertaining to the effects of fast-track application in terms of time and cost, it has been difficult for project owners to determine its correct application. This paper presents the time and cost optimized decision support (TACTICS) model, and it was developed based on the fast-track methodology and genetic algorithms (GAs). TACTICS was applied to two case studies, and the results indicated that the fast-track method could be expected to deliver more efficient projects compared with using the traditional method. In particular, (1) the average reduction in project duration by applying the fast-track method was 40.48% (Case I) and 18.59% (Case II) compared with using the traditional method, and (2) the average project costs were reduced by as much as 0.39% (Case I) and 4.48% (Case II). Consequently, TACTICS could be expected to help in making a decision regarding the fast-track application and further contribute to the project scheduling expertise in the construction engineering and management body of knowledge.
    • Download: (1.213Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time and Cost–Optimized Decision Support Model for Fast-Track Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58738
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKyuman Cho
    contributor authorMakarand Hastak
    date accessioned2017-05-08T21:39:49Z
    date available2017-05-08T21:39:49Z
    date copyrightJanuary 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000577.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58738
    description abstractThe fast-track method is one of the most recognized methodologies for reducing construction project schedules. However, due to the lack of definitive research to date pertaining to the effects of fast-track application in terms of time and cost, it has been difficult for project owners to determine its correct application. This paper presents the time and cost optimized decision support (TACTICS) model, and it was developed based on the fast-track methodology and genetic algorithms (GAs). TACTICS was applied to two case studies, and the results indicated that the fast-track method could be expected to deliver more efficient projects compared with using the traditional method. In particular, (1) the average reduction in project duration by applying the fast-track method was 40.48% (Case I) and 18.59% (Case II) compared with using the traditional method, and (2) the average project costs were reduced by as much as 0.39% (Case I) and 4.48% (Case II). Consequently, TACTICS could be expected to help in making a decision regarding the fast-track application and further contribute to the project scheduling expertise in the construction engineering and management body of knowledge.
    publisherAmerican Society of Civil Engineers
    titleTime and Cost–Optimized Decision Support Model for Fast-Track Projects
    typeJournal Paper
    journal volume139
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000570
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian