description abstract | “Group Scheduling,” which is operations scheduling based on the Group Technology concept, was analyzed in a multistage manufacturing system. In the case of fabricating multiple parts (jobs) grouped into several group cells, both optimal group and optimal job sequences were determined such that the total flow time (makespan) was minimized, by means of the branch-and-bound method. In addition, optimal machining speeds to be utilized on multiple stages (machines) for each job were determined to reduce the total production cost as much as possible. Optimizing algorithms for this Group Scheduling Technique were also presented with numerical examples. | |
publisher | The American Society of Mechanical Engineers (ASME) | |
title | Group Scheduling Technique for Multiproduct, Multistage Manufacturing Systems | |
type | Journal Paper | |
journal volume | 99 | |
journal issue | 3 | |
journal title | Journal of Manufacturing Science and Engineering | |
identifier doi | 10.1115/1.3439310 | |
journal fristpage | 759 | |
journal lastpage | 765 | |
identifier eissn | 1528-8935 | |
keywords | Manufacturing systems | |
keywords | Flow (Dynamics) | |
keywords | Machinery | |
keywords | Machining | |
keywords | Algorithms AND Bifurcation | |
tree | Journal of Manufacturing Science and Engineering:;1977:;volume( 099 ):;issue: 003 | |
contenttype | Fulltext | |