Show simple item record

contributor authorK. Hitomi
contributor authorI. Ham
date accessioned2017-05-08T23:03:24Z
date available2017-05-08T23:03:24Z
date copyrightAugust, 1977
date issued1977
identifier issn1087-1357
identifier otherJMSEFK-27662#759_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/90200
description abstract“Group Scheduling,” which is operations scheduling based on the Group Technology concept, was analyzed in a multistage manufacturing system. In the case of fabricating multiple parts (jobs) grouped into several group cells, both optimal group and optimal job sequences were determined such that the total flow time (makespan) was minimized, by means of the branch-and-bound method. In addition, optimal machining speeds to be utilized on multiple stages (machines) for each job were determined to reduce the total production cost as much as possible. Optimizing algorithms for this Group Scheduling Technique were also presented with numerical examples.
publisherThe American Society of Mechanical Engineers (ASME)
titleGroup Scheduling Technique for Multiproduct, Multistage Manufacturing Systems
typeJournal Paper
journal volume99
journal issue3
journal titleJournal of Manufacturing Science and Engineering
identifier doi10.1115/1.3439310
journal fristpage759
journal lastpage765
identifier eissn1528-8935
keywordsManufacturing systems
keywordsFlow (Dynamics)
keywordsMachinery
keywordsMachining
keywordsAlgorithms AND Bifurcation
treeJournal of Manufacturing Science and Engineering:;1977:;volume( 099 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record