YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Surrogate Model Approach to Predict Operations and Maintenance Cost for Combined Cycle Power Plant

    Source: Journal of Engineering for Gas Turbines and Power:;2024:;volume( 147 ):;issue: 002::page 21009-1
    Author:
    Choi, Woosung
    ,
    Webb, Bobby M.
    ,
    Noble, David R.
    DOI: 10.1115/1.4066252
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: In the transition toward carbon neutrality by 2050, renewable energy sources are gaining prominence. The variability of renewable energy poses challenges for power grid stability. Gas turbine combined cycle (GTCC) power plants play a crucial role in grid stabilization, especially during peak loads. In GTCC power generation, operations and maintenance (O&M) cost is the next most important after fuel and initial investment cost, and it is necessary to predict O&M cost according to changes in the operating environment for efficient and stable operation of GTCC power plant. However, various uncertainties exist when estimating O&M costs because actual design information is limitedly disclosed due to maintenance contracts between operators and manufacturers, and it is difficult to obtain accurate variables according to the operation condition. In this paper, the correlation was analyzed considering the uncertainty of the factors affecting the O&M cost of the GTCC power plant through sensitivity analysis, and the main factors were defined. In addition, a surrogate model was proposed that can quickly calculate fixed and variable O&M cost according to changing operating scenarios such as shortening startup time, enhancing ramp rate, or lower minimum load. Through the case study, short-term and long-term O&M costs can be estimated in the operating environment of the GTCC power plant currently being operated. Additionally, the model facilitates cost projections for new hybrid GTCC facilities (combining gas turbines with energy storage systems), aiding long-term investment planning.
    • Download: (2.082Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Surrogate Model Approach to Predict Operations and Maintenance Cost for Combined Cycle Power Plant

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4306611
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorChoi, Woosung
    contributor authorWebb, Bobby M.
    contributor authorNoble, David R.
    date accessioned2025-04-21T10:38:41Z
    date available2025-04-21T10:38:41Z
    date copyright9/26/2024 12:00:00 AM
    date issued2024
    identifier issn0742-4795
    identifier othergtp_147_02_021009.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4306611
    description abstractIn the transition toward carbon neutrality by 2050, renewable energy sources are gaining prominence. The variability of renewable energy poses challenges for power grid stability. Gas turbine combined cycle (GTCC) power plants play a crucial role in grid stabilization, especially during peak loads. In GTCC power generation, operations and maintenance (O&M) cost is the next most important after fuel and initial investment cost, and it is necessary to predict O&M cost according to changes in the operating environment for efficient and stable operation of GTCC power plant. However, various uncertainties exist when estimating O&M costs because actual design information is limitedly disclosed due to maintenance contracts between operators and manufacturers, and it is difficult to obtain accurate variables according to the operation condition. In this paper, the correlation was analyzed considering the uncertainty of the factors affecting the O&M cost of the GTCC power plant through sensitivity analysis, and the main factors were defined. In addition, a surrogate model was proposed that can quickly calculate fixed and variable O&M cost according to changing operating scenarios such as shortening startup time, enhancing ramp rate, or lower minimum load. Through the case study, short-term and long-term O&M costs can be estimated in the operating environment of the GTCC power plant currently being operated. Additionally, the model facilitates cost projections for new hybrid GTCC facilities (combining gas turbines with energy storage systems), aiding long-term investment planning.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleA Surrogate Model Approach to Predict Operations and Maintenance Cost for Combined Cycle Power Plant
    typeJournal Paper
    journal volume147
    journal issue2
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.4066252
    journal fristpage21009-1
    journal lastpage21009-7
    page7
    treeJournal of Engineering for Gas Turbines and Power:;2024:;volume( 147 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian