YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation

    Source: Journal of Engineering for Gas Turbines and Power:;2018:;volume( 140 ):;issue: 001::page 12603
    Author:
    Topel, Monika
    ,
    Nilsson, Åsa
    ,
    Jöcker, Markus
    ,
    Laumert, Björn
    DOI: 10.1115/1.4037664
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Liberalized electricity market conditions and concentrating solar power technologies call for increased power plant operational flexibility. Concerning the steam turbine (ST) component, one key aspect of its flexibility is the capability for fast starts. In current practice, turbine start-up limitations are set by consideration of thermal stress and low cycle fatigue. However, the pursuit of faster starts raises the question whether other thermal phenomena can become a limiting factor to the start-up process. Differential expansion (DE) is one of such thermal properties, especially since the design of axial clearances is not included as part of start-up schedule design and because its measurement during operation is often limited or not a possibility at all. The aim of this work is to understand DE behavior with respect to transient operation and to quantify the effect that such operation would have in the design and operation of axial clearances. This was accomplished through the use of a validated thermomechanical model that was used to compare DE behavior for different operating conditions of the machine. These comparisons showed that faster starts do not necessarily imply that wider axial clearances are needed, which means that the thermal flexibility of the studied turbine is not limited by DE. However, for particular locations, it was also obtained that axial rubbing can indeed become a limiting factor in direct relation to start-up operation. The resulting approach presented in this work serves to avoid over-conservative limitations in both design and operation concerning axial clearances.
    • Download: (2.947Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Investigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4251335
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorTopel, Monika
    contributor authorNilsson, Åsa
    contributor authorJöcker, Markus
    contributor authorLaumert, Björn
    date accessioned2019-02-28T10:58:32Z
    date available2019-02-28T10:58:32Z
    date copyright9/19/2017 12:00:00 AM
    date issued2018
    identifier issn0742-4795
    identifier othergtp_140_01_012603.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4251335
    description abstractLiberalized electricity market conditions and concentrating solar power technologies call for increased power plant operational flexibility. Concerning the steam turbine (ST) component, one key aspect of its flexibility is the capability for fast starts. In current practice, turbine start-up limitations are set by consideration of thermal stress and low cycle fatigue. However, the pursuit of faster starts raises the question whether other thermal phenomena can become a limiting factor to the start-up process. Differential expansion (DE) is one of such thermal properties, especially since the design of axial clearances is not included as part of start-up schedule design and because its measurement during operation is often limited or not a possibility at all. The aim of this work is to understand DE behavior with respect to transient operation and to quantify the effect that such operation would have in the design and operation of axial clearances. This was accomplished through the use of a validated thermomechanical model that was used to compare DE behavior for different operating conditions of the machine. These comparisons showed that faster starts do not necessarily imply that wider axial clearances are needed, which means that the thermal flexibility of the studied turbine is not limited by DE. However, for particular locations, it was also obtained that axial rubbing can indeed become a limiting factor in direct relation to start-up operation. The resulting approach presented in this work serves to avoid over-conservative limitations in both design and operation concerning axial clearances.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleInvestigation Into the Thermal Limitations of Steam Turbines During Start-Up Operation
    typeJournal Paper
    journal volume140
    journal issue1
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.4037664
    journal fristpage12603
    journal lastpage012603-8
    treeJournal of Engineering for Gas Turbines and Power:;2018:;volume( 140 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian