YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Investigation of Different Operation Strategies to Provide Balance Energy With an Industrial Combined Heat and Power Plant Using Dynamic Simulation

    Source: Journal of Engineering for Gas Turbines and Power:;2017:;volume( 139 ):;issue: 001::page 11801
    Author:
    Kahlert, Steffen
    ,
    Spliethoff, Hartmut
    DOI: 10.1115/1.4034184
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Intermittency of renewable electricity generation poses a challenge to thermal power plants. While power plants in the public sector see a decrease in operating hours, the utilization of industrial power plants is mostly unaffected because process steam has to be provided. This study investigates to what extent the load of a combined heat and power (CHP) plant can be reduced while maintaining a reliable process steam supply. A dynamic process model of an industrial combined CHP plant is developed and validated with operational data. The model contains a gas turbine (GT), a single pressure heat recovery system generator (HRSG) with supplementary firing and an extraction condensing steam turbine. Technical limitations of the gas turbine, the supplementary firing, and the steam turbine constrain the load range of the plant. In consideration of these constraints, different operation strategies are performed at variable loads using dynamic simulation. A simulation study shows feasible load changes in 5 min for provision of secondary control reserve (SCR). The load change capability of the combined cycle plant under consideration is mainly restricted by the water–steam cycle. It is shown that both the low pressure control valve (LPCV) of the extraction steam turbine and the high pressure bypass control valve are suitable to ensure the process steam supply during the load change. The controllability of the steam turbine load and the process stability are sufficient as long as the supplementary is not reaching the limits of the operating range.
    • Download: (980.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Investigation of Different Operation Strategies to Provide Balance Energy With an Industrial Combined Heat and Power Plant Using Dynamic Simulation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4237019
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorKahlert, Steffen
    contributor authorSpliethoff, Hartmut
    date accessioned2017-11-25T07:21:21Z
    date available2017-11-25T07:21:21Z
    date copyright2016/16/8
    date issued2017
    identifier issn0742-4795
    identifier othergtp_139_01_011801.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4237019
    description abstractIntermittency of renewable electricity generation poses a challenge to thermal power plants. While power plants in the public sector see a decrease in operating hours, the utilization of industrial power plants is mostly unaffected because process steam has to be provided. This study investigates to what extent the load of a combined heat and power (CHP) plant can be reduced while maintaining a reliable process steam supply. A dynamic process model of an industrial combined CHP plant is developed and validated with operational data. The model contains a gas turbine (GT), a single pressure heat recovery system generator (HRSG) with supplementary firing and an extraction condensing steam turbine. Technical limitations of the gas turbine, the supplementary firing, and the steam turbine constrain the load range of the plant. In consideration of these constraints, different operation strategies are performed at variable loads using dynamic simulation. A simulation study shows feasible load changes in 5 min for provision of secondary control reserve (SCR). The load change capability of the combined cycle plant under consideration is mainly restricted by the water–steam cycle. It is shown that both the low pressure control valve (LPCV) of the extraction steam turbine and the high pressure bypass control valve are suitable to ensure the process steam supply during the load change. The controllability of the steam turbine load and the process stability are sufficient as long as the supplementary is not reaching the limits of the operating range.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleInvestigation of Different Operation Strategies to Provide Balance Energy With an Industrial Combined Heat and Power Plant Using Dynamic Simulation
    typeJournal Paper
    journal volume139
    journal issue1
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.4034184
    journal fristpage11801
    journal lastpage011801-8
    treeJournal of Engineering for Gas Turbines and Power:;2017:;volume( 139 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian