YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Development of a Maintenance Program for Major Gas Turbine Hot Gas Path Parts

    Source: Journal of Engineering for Gas Turbines and Power:;2002:;volume( 124 ):;issue: 004::page 867
    Author:
    H. Moritsuka
    ,
    T. Fujii
    ,
    T. Takahashi
    DOI: 10.1115/1.1399055
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The thermal efficiency of gas turbine combined cycle power generation plants increase significantly in accordance with turbine inlet temperature. Gas turbine combined cycle power plants operating at high turbine inlet temperature are popular as a main thermal power station among our electric power companies in Japan. Thus, gas turbine hot gas parts are working under extreme conditions which will strongly affect their lifetime as well as maintenance costs for repaired and replaced parts. To reduce the latter is of major importance to enhance cost effectiveness of the plant. This report describes a gas turbine maintenance management program of main hot gas parts (combustor chambers, transition pieces, turbine first stage nozzles and first stage buckets) for management persons of gas turbine combined cycle power stations in order to obtain an optimal gas turbine maintenance schedule considering rotation, repair and replacement, or exchange of those parts.
    keyword(s): Maintenance , Gas turbines AND Combustion chambers ,
    • Download: (2.040Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Development of a Maintenance Program for Major Gas Turbine Hot Gas Path Parts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/126701
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorH. Moritsuka
    contributor authorT. Fujii
    contributor authorT. Takahashi
    date accessioned2017-05-09T00:07:21Z
    date available2017-05-09T00:07:21Z
    date copyrightOctober, 2002
    date issued2002
    identifier issn1528-8919
    identifier otherJETPEZ-26816#867_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/126701
    description abstractThe thermal efficiency of gas turbine combined cycle power generation plants increase significantly in accordance with turbine inlet temperature. Gas turbine combined cycle power plants operating at high turbine inlet temperature are popular as a main thermal power station among our electric power companies in Japan. Thus, gas turbine hot gas parts are working under extreme conditions which will strongly affect their lifetime as well as maintenance costs for repaired and replaced parts. To reduce the latter is of major importance to enhance cost effectiveness of the plant. This report describes a gas turbine maintenance management program of main hot gas parts (combustor chambers, transition pieces, turbine first stage nozzles and first stage buckets) for management persons of gas turbine combined cycle power stations in order to obtain an optimal gas turbine maintenance schedule considering rotation, repair and replacement, or exchange of those parts.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleDevelopment of a Maintenance Program for Major Gas Turbine Hot Gas Path Parts
    typeJournal Paper
    journal volume124
    journal issue4
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.1399055
    journal fristpage867
    journal lastpage873
    identifier eissn0742-4795
    keywordsMaintenance
    keywordsGas turbines AND Combustion chambers
    treeJournal of Engineering for Gas Turbines and Power:;2002:;volume( 124 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian