contributor author | R. Yokoyama | |
contributor author | K. Ito | |
date accessioned | 2017-05-08T23:59:24Z | |
date available | 2017-05-08T23:59:24Z | |
date copyright | December, 1999 | |
date issued | 1999 | |
identifier issn | 0195-0738 | |
identifier other | JERTD2-26486#254_1.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/122031 | |
description abstract | A rational method of determining the operational strategy of energy supply plants in consideration of equipment startup/shutdown cost is proposed. The operational planning problem is formulated as a large-scale mixed-integer linear programming one, in which on/off status and energy flow rates of equipment are determined so as to minimize the sum of energy supply and startup/shutdown costs over the period considered. By utilizing a special structure of the problem, an algorithm of solving the problem efficiently is proposed. Through a numerical study on the daily operational planning of a gas turbine cogeneration plant for district heating and cooling, the effectiveness of the proposed algorithm, is ascertained in terms of computation time, and the influence of equipment startup/shutdown cost on the operational strategy and cost is clarified. | |
publisher | The American Society of Mechanical Engineers (ASME) | |
title | Optimal Operation of a Gogeneration Plant in Consideration of Equipment Startup/Shutdown Cost | |
type | Journal Paper | |
journal volume | 121 | |
journal issue | 4 | |
journal title | Journal of Energy Resources Technology | |
identifier doi | 10.1115/1.2795991 | |
journal fristpage | 254 | |
journal lastpage | 261 | |
identifier eissn | 1528-8994 | |
keywords | Industrial plants | |
keywords | Algorithms | |
keywords | Gas turbines | |
keywords | Combined heat and power | |
keywords | Computation | |
keywords | Linear programming | |
keywords | Flow (Dynamics) | |
keywords | Cooling AND Central heating | |
tree | Journal of Energy Resources Technology:;1999:;volume( 121 ):;issue: 004 | |
contenttype | Fulltext | |