Show simple item record

contributor authorR. Yokoyama
contributor authorK. Ito
date accessioned2017-05-08T23:59:24Z
date available2017-05-08T23:59:24Z
date copyrightDecember, 1999
date issued1999
identifier issn0195-0738
identifier otherJERTD2-26486#254_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/122031
description abstractA rational method of determining the operational strategy of energy supply plants in consideration of equipment startup/shutdown cost is proposed. The operational planning problem is formulated as a large-scale mixed-integer linear programming one, in which on/off status and energy flow rates of equipment are determined so as to minimize the sum of energy supply and startup/shutdown costs over the period considered. By utilizing a special structure of the problem, an algorithm of solving the problem efficiently is proposed. Through a numerical study on the daily operational planning of a gas turbine cogeneration plant for district heating and cooling, the effectiveness of the proposed algorithm, is ascertained in terms of computation time, and the influence of equipment startup/shutdown cost on the operational strategy and cost is clarified.
publisherThe American Society of Mechanical Engineers (ASME)
titleOptimal Operation of a Gogeneration Plant in Consideration of Equipment Startup/Shutdown Cost
typeJournal Paper
journal volume121
journal issue4
journal titleJournal of Energy Resources Technology
identifier doi10.1115/1.2795991
journal fristpage254
journal lastpage261
identifier eissn1528-8994
keywordsIndustrial plants
keywordsAlgorithms
keywordsGas turbines
keywordsCombined heat and power
keywordsComputation
keywordsLinear programming
keywordsFlow (Dynamics)
keywordsCooling AND Central heating
treeJournal of Energy Resources Technology:;1999:;volume( 121 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record