contributor author | A. Ferriere | |
contributor author | M. Amouroux | |
contributor author | B. Bonduelle | |
date accessioned | 2017-05-08T23:30:56Z | |
date available | 2017-05-08T23:30:56Z | |
date copyright | November, 1989 | |
date issued | 1989 | |
identifier issn | 0199-6231 | |
identifier other | JSEEDO-28217#298_1.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/105928 | |
description abstract | This first part of a twofold article is devoted to the presentation of a model of the Themis central receiver solar plant. The Themis experiment showed that the energy balance is deteriorated by internal (parasitic) energy consumption during outages and that the operating procedures were not optimized. Our model takes into account all blocks of the main transfer chain that are involved in the global energy balance. Thanks to a set of control variables, we can simulate various operating procedures. This paper describes the state equations and details the case of the solar receiver. | |
publisher | The American Society of Mechanical Engineers (ASME) | |
title | Development of an Optimal Control Strategy for the Themis Solar Plant: Part I—Themis Transient Model | |
type | Journal Paper | |
journal volume | 111 | |
journal issue | 4 | |
journal title | Journal of Solar Energy Engineering | |
identifier doi | 10.1115/1.3268326 | |
journal fristpage | 298 | |
journal lastpage | 304 | |
identifier eissn | 1528-8986 | |
keywords | Optimal control | |
keywords | Solar energy | |
keywords | Industrial plants | |
keywords | Energy budget (Physics) | |
keywords | Chain | |
keywords | Energy consumption AND Equations | |
tree | Journal of Solar Energy Engineering:;1989:;volume( 111 ):;issue: 004 | |
contenttype | Fulltext | |