Search
Now showing items 1-10 of 14
Budget Allocation for Steel Bridge Paint Maintenance
Publisher: American Society of Civil Engineers
Abstract: Government authorities are responsible for managing their available budget so that they gain maximum benefit. Therefore, they must make intelligent decisions as to which projects will be funded and the degree of funding. ...
Productivity and Cost Assessment for Continuous Flight Auger Piles
Publisher: American Society of Civil Engineers
Abstract: Continuous flight auger (CFA) piles do not receive sufficient research attention although they are widely used in the United States, United Kingdom, and other countries in the world. Therefore, this paper focuses on ...
Simulation of Concrete Batch Plant Production
Publisher: American Society of Civil Engineers
Abstract: The decision-making process is a very essential part of any construction operation. Simulation can be used as a tool to assist construction managers in making informed decisions. In this paper, simulation is applied to ...
Resource Allocation for Concrete Batch Plant Operation: Case Study
Publisher: American Society of Civil Engineers
Abstract: A concrete batch plant is an important element in any concrete construction process, whether it is working as a central mixing plant onsite or is offsite supplying ready mixed concrete to a project. This study tackles the ...
Prototype Model for Build-Operate-Transfer Risk Assessment
Publisher: American Society of Civil Engineers
Abstract: The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession ...
Closure to “Statewide Performance Function for Steel Bridge Protection Systems” by Tarek M. Zayed, Luh-Maan Chang, and Jon D. Fricker
Publisher: American Society of Civil Engineers
Productivity and Cost Regression Models for Pile Construction
Publisher: American Society of Civil Engineers
Abstract: The estimating process of pile construction productivity and cost is intricated because of several factors: unseen subsurface obstacles; lack of contractor experience; site planning; and pile equipment maintainability. ...
Pile Construction Productivity Assessment
Publisher: American Society of Civil Engineers
Abstract: Bored piles are vital elements for highway bridge foundation. A large number of factors oversees productivity and cost estimation processes for piles, which creates many problems for the time and cost estimators of such ...
Simulation as a Tool for Pile Productivity Assessment
Publisher: American Society of Civil Engineers
Abstract: Subsurface obstacles, lack of contractor experience, site planning in addition to other factors complicated the installation process of pile foundation. Productivity and cost estimates for such a process are affected by ...
Quantitative Assessment for Piles Productivity Factors
Publisher: American Society of Civil Engineers
Abstract: The management process of any construction operation usually can be defined as a chain of decisions. A decision-maker can bid, plan, and organize the bored pile projects based on an accurate estimate of productivity. To ...