YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Productivity and Cost Regression Models for Pile Construction

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 007
    Author:
    Tarek M. Zayed
    ,
    Daniel W. Halpin
    DOI: 10.1061/(ASCE)0733-9364(2005)131:7(779)
    Publisher: American Society of Civil Engineers
    Abstract: The estimating process of pile construction productivity and cost is intricated because of several factors: unseen subsurface obstacles; lack of contractor experience; site planning; and pile equipment maintainability. This study intends to assess cycle time, productivity, and cost for pile construction considering the effect of the above factors using regression technique. Data were collected through designated questionnaires, site interviews, and telephone calls to experts in different construction companies. Many variables have been considered in the pile construction process. Seven regression linear models have been designed and validated to assess productivity, cycle time, and cost. Consequently, three sets of charts have been developed based upon the validated models to provide the decision maker with a solid planning, scheduling, and control tool for pile construction projects. This research is relevant to both industry practitioners and researchers. It provides sets of charts and models for practitioners’ usage to schedule and price out pile construction projects. In addition, it provides the researchers with the methodology of designating regression models for the pile construction process, its limitations, and future suggestions.
    • Download: (214.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Productivity and Cost Regression Models for Pile Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24264
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTarek M. Zayed
    contributor authorDaniel W. Halpin
    date accessioned2017-05-08T20:42:32Z
    date available2017-05-08T20:42:32Z
    date copyrightJuly 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A7%28779%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24264
    description abstractThe estimating process of pile construction productivity and cost is intricated because of several factors: unseen subsurface obstacles; lack of contractor experience; site planning; and pile equipment maintainability. This study intends to assess cycle time, productivity, and cost for pile construction considering the effect of the above factors using regression technique. Data were collected through designated questionnaires, site interviews, and telephone calls to experts in different construction companies. Many variables have been considered in the pile construction process. Seven regression linear models have been designed and validated to assess productivity, cycle time, and cost. Consequently, three sets of charts have been developed based upon the validated models to provide the decision maker with a solid planning, scheduling, and control tool for pile construction projects. This research is relevant to both industry practitioners and researchers. It provides sets of charts and models for practitioners’ usage to schedule and price out pile construction projects. In addition, it provides the researchers with the methodology of designating regression models for the pile construction process, its limitations, and future suggestions.
    publisherAmerican Society of Civil Engineers
    titleProductivity and Cost Regression Models for Pile Construction
    typeJournal Paper
    journal volume131
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:7(779)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian