YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantitative Assessment for Piles Productivity Factors

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 003
    Author:
    Tarek M. Zayed
    ,
    Daniel W. Halpin
    DOI: 10.1061/(ASCE)0733-9364(2004)130:3(405)
    Publisher: American Society of Civil Engineers
    Abstract: The management process of any construction operation usually can be defined as a chain of decisions. A decision-maker can bid, plan, and organize the bored pile projects based on an accurate estimate of productivity. To estimate productivity efficiently, piling process qualitative and quantitative factors have to be considered. This paper focuses on assessing the effect of subjective factors on bored pile construction productivity. A productivity index (PI) model is developed to represent this subjective effect in refining productivity assessment using simulation and deterministic techniques. The analytic hierarchy process and fuzzy logic are used to develop the proposed PI model that relies on the actual performance of 10 main piling process subjective factors. Subjective data were collected from bored pile (drilled shaft) contractors considering these subjective factors. The developed PI model implementation to piling process resulted in PI=0.7. This value has been validated using simulation model outputs.
    • Download: (455.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantitative Assessment for Piles Productivity Factors

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22109
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTarek M. Zayed
    contributor authorDaniel W. Halpin
    date accessioned2017-05-08T20:38:34Z
    date available2017-05-08T20:38:34Z
    date copyrightJune 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A3%28405%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22109
    description abstractThe management process of any construction operation usually can be defined as a chain of decisions. A decision-maker can bid, plan, and organize the bored pile projects based on an accurate estimate of productivity. To estimate productivity efficiently, piling process qualitative and quantitative factors have to be considered. This paper focuses on assessing the effect of subjective factors on bored pile construction productivity. A productivity index (PI) model is developed to represent this subjective effect in refining productivity assessment using simulation and deterministic techniques. The analytic hierarchy process and fuzzy logic are used to develop the proposed PI model that relies on the actual performance of 10 main piling process subjective factors. Subjective data were collected from bored pile (drilled shaft) contractors considering these subjective factors. The developed PI model implementation to piling process resulted in PI=0.7. This value has been validated using simulation model outputs.
    publisherAmerican Society of Civil Engineers
    titleQuantitative Assessment for Piles Productivity Factors
    typeJournal Paper
    journal volume130
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:3(405)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian