Productivity and Cost Assessment for Continuous Flight Auger PilesSource: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 006Author:Tarek M. Zayed
DOI: 10.1061/(ASCE)0733-9364(2005)131:6(677)Publisher: American Society of Civil Engineers
Abstract: Continuous flight auger (CFA) piles do not receive sufficient research attention although they are widely used in the United States, United Kingdom, and other countries in the world. Therefore, this paper focuses on describing the CFA pile installation features, exploring its construction methods, and determining the factors that affect the CFA pile productivity and cost. A productivity index (PI) is developed to quantify the effect of subjective factors on the CFA process productivity. Current research concludes a PI value of 0.78 out of 1.0 (efficiency). Several models are designated to assess the CFA pile’s cycle time, productivity, and cost using deterministic approach. Various charts are developed to show this assessment based upon these models. Results show that the cycle time for
|
Show full item record
contributor author | Tarek M. Zayed | |
date accessioned | 2017-05-08T20:42:20Z | |
date available | 2017-05-08T20:42:20Z | |
date copyright | June 2005 | |
date issued | 2005 | |
identifier other | %28asce%290733-9364%282005%29131%3A6%28677%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/24142 | |
description abstract | Continuous flight auger (CFA) piles do not receive sufficient research attention although they are widely used in the United States, United Kingdom, and other countries in the world. Therefore, this paper focuses on describing the CFA pile installation features, exploring its construction methods, and determining the factors that affect the CFA pile productivity and cost. A productivity index (PI) is developed to quantify the effect of subjective factors on the CFA process productivity. Current research concludes a PI value of 0.78 out of 1.0 (efficiency). Several models are designated to assess the CFA pile’s cycle time, productivity, and cost using deterministic approach. Various charts are developed to show this assessment based upon these models. Results show that the cycle time for | |
publisher | American Society of Civil Engineers | |
title | Productivity and Cost Assessment for Continuous Flight Auger Piles | |
type | Journal Paper | |
journal volume | 131 | |
journal issue | 6 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(2005)131:6(677) | |
tree | Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 006 | |
contenttype | Fulltext |