Show simple item record

contributor authorTarek M. Zayed
date accessioned2017-05-08T20:42:20Z
date available2017-05-08T20:42:20Z
date copyrightJune 2005
date issued2005
identifier other%28asce%290733-9364%282005%29131%3A6%28677%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24142
description abstractContinuous flight auger (CFA) piles do not receive sufficient research attention although they are widely used in the United States, United Kingdom, and other countries in the world. Therefore, this paper focuses on describing the CFA pile installation features, exploring its construction methods, and determining the factors that affect the CFA pile productivity and cost. A productivity index (PI) is developed to quantify the effect of subjective factors on the CFA process productivity. Current research concludes a PI value of 0.78 out of 1.0 (efficiency). Several models are designated to assess the CFA pile’s cycle time, productivity, and cost using deterministic approach. Various charts are developed to show this assessment based upon these models. Results show that the cycle time for
publisherAmerican Society of Civil Engineers
titleProductivity and Cost Assessment for Continuous Flight Auger Piles
typeJournal Paper
journal volume131
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2005)131:6(677)
treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record