YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 17

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction 

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    Author(s): Elnaz Safapour; Sharareh Kermanshachi
    Publisher: American Society of Civil Engineers
    Abstract: Many large-scale construction projects suffer from the issuance of rework that ultimately leads to substantial cost overruns and major scheduling delays. Scholars and practitioners worldwide have assessed the impact of ...
    Request PDF

    Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment 

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 001
    Author(s): Sharareh Kermanshachi; Elnaz Safapour
    Publisher: ASCE
    Abstract: Practitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To ...
    Request PDF

    Investigation of the Causal Relationships among Different Barrier Categories to Timely Posthurricane Recovery 

    Source: Natural Hazards Review:;2022:;Volume ( 023 ):;issue: 003:;page 04022013
    Author(s): Behzad Rouhanizadeh; Sharareh Kermanshachi
    Publisher: ASCE
    Abstract: The incidence of hurricanes has increased in the United States during recent years, affecting many aspects of the lives of those who have fallen victim to them. Delays that may be due to unexpected barriers to the recovery ...
    Request PDF

    Analysis of the Health and Safety Challenges Faced by Construction Workers in Extreme Hot Weather Conditions 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 001:;page 04522048-1
    Author(s): Sanjgna Karthick; Sharareh Kermanshachi; Apurva Pamidimukkala
    Publisher: American Society of Civil Engineers
    Abstract: The increasing number of extremely hot days globally has made outdoor workers more vulnerable to heat-related illnesses such as heat syncope, heat exhaustion, heat edema, and heat stress. The objective of this article is ...
    Request PDF

    Robustness Analysis of Total Project Cost and Schedule Delay and Overrun Indicators of Heavy Industrial Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002:;page 04523005-1
    Author(s): Sharareh Kermanshachi; Apurva Pamidimukkala
    Publisher: American Society of Civil Engineers
    Abstract: Barriers such as cost overruns and schedule delays make it challenging to achieve successful project outcomes. Their early detection, however, allows mitigation strategies to be implemented before too much delay has occurred; ...
    Request PDF

    Application of Delphi Method in Identifying, Ranking, and Weighting Project Complexity Indicators for Construction Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Sharareh Kermanshachi; Behzad Rouhanizadeh; Bac Dao
    Publisher: ASCE
    Abstract: Experts believe that project performance ultimately suffers because of complexity issues. Although some studies have focused on identifying leading project complexity indicators (CIs), the weighted impact of each CI has ...
    Request PDF

    Identification and Categorization of Policy and Legal Barriers to Long-Term Timely Postdisaster Reconstruction 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003
    Author(s): Behzad Rouhanizadeh; Sharareh Kermanshachi; Vaibhav Sanjay Dhamangaonkar
    Publisher: American Society of Civil Engineers
    Abstract: Some communities are able to return to a normal state quickly after a disaster; however, the causes of delays in the postdisaster recovery phase remain an important concern. Policy and legal barriers are fundamental causes ...
    Request PDF

    Predictive Analytics Approach to Evaluate Wage Inequality in Engineering Organizations 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 006
    Author(s): Amirhosein Jafari; Behzad Rouhanizadeh; Sharareh Kermanshachi; Munahil Murrieum
    Publisher: ASCE
    Abstract: Wage inequality is a source of many social and economic problems, and is the target of mitigating programs both nationally and internationally. The primary step toward developing effective programs to reduce or eliminate ...
    Request PDF

    Optimal Pipeline Maintenance Strategies in the United States: Stochastic Reliability Analysis of Gas Pipeline Network Failures 

    Source: Journal of Pipeline Systems Engineering and Practice:;2020:;Volume ( 011 ):;issue: 001
    Author(s): Sharareh Kermanshachi; Behzad Rouhanizadeh; Mustafa M. Cobanoglu; Ivan Damnjanovic
    Publisher: ASCE
    Abstract: The increasing number of corrosion-based incidents in pipeline systems within recent decades has encouraged decision makers to focus on predicting when pipelines will fail, and to improve maintenance strategies. Policymakers ...
    Request PDF

    Exploratory Analysis of Human-, Organizational-, and Project-Based Reworks: Challenges and Strategies 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521045
    Author(s): Elnaz Safapour; Sharareh Kermanshachi; Piyush Taneja; Apurva Pamidimukkala
    Publisher: ASCE
    Abstract: Reworks are unavoidable during the design and construction phases of construction projects and significantly increase the time and cost required to complete projects. Several studies have been conducted to determine how ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian