YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    Author:
    Elnaz Safapour; Sharareh Kermanshachi
    DOI: 10.1061/(ASCE)ME.1943-5479.0000669
    Publisher: American Society of Civil Engineers
    Abstract: Many large-scale construction projects suffer from the issuance of rework that ultimately leads to substantial cost overruns and major scheduling delays. Scholars and practitioners worldwide have assessed the impact of these changes and the critical causes behind them, finding mitigation difficult after the rework has been done. Therefore, identification of the early indicators of manageable rework causes and implementation of the appropriate mitigating strategies prior to the need for rework are important. The aim of this study was to identify the indicators of manageable rework causes (IMRCs) and select the appropriate construction best practices (BPs) to reduce the cost of manageable and controllable rework in terms of the total cost of a project. To fulfill the objectives of this study, 51 manageable causes of rework were identified through a comprehensive literature review. According to the nature of BP strategies, the identified IMRCs were classified into three main categories: organization, project, and people. Then, data from 44 case study projects were collected and analyzed. Because information regarding other aspects of these projects, not available through the case study data, was required for this study, a questionnaire was developed and administered to collect additional data about these construction projects. For this purpose, a representative from each project was selected and asked to complete the survey. Finally, 32 significant IMRCs, characterized by 13 attributes, were determined. The project management team (PMT) is typically responsible for preparing the plan, building an effective team, and monitoring the process; therefore, the experience of the PMT in the design and/or construction phase and the number of PMTs who work in a construction project are the most important indicators and contribute the most weight in deriving rework. Next, BPs identified by a construction industry institute were investigated, and among them, 10 BPs were found significantly beneficial for decreasing the cost of rework associated with IMRCs. The implementation of front-end planning determines the feasibility of a project and evaluation of the conceptual scope during the preplanning phase; thus, the design errors due to challenges regarding finance and scope attributes can be decreased with front-end planning. The outcomes of this study may help stakeholders and project managers identify the indicators of rework early in construction projects so they can select the appropriate BP to reduce the costs of rework and improve the project time to completion and cost performance.
    • Download: (245.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4255242
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorElnaz Safapour; Sharareh Kermanshachi
    date accessioned2019-03-10T12:16:11Z
    date available2019-03-10T12:16:11Z
    date issued2019
    identifier other%28ASCE%29ME.1943-5479.0000669.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255242
    description abstractMany large-scale construction projects suffer from the issuance of rework that ultimately leads to substantial cost overruns and major scheduling delays. Scholars and practitioners worldwide have assessed the impact of these changes and the critical causes behind them, finding mitigation difficult after the rework has been done. Therefore, identification of the early indicators of manageable rework causes and implementation of the appropriate mitigating strategies prior to the need for rework are important. The aim of this study was to identify the indicators of manageable rework causes (IMRCs) and select the appropriate construction best practices (BPs) to reduce the cost of manageable and controllable rework in terms of the total cost of a project. To fulfill the objectives of this study, 51 manageable causes of rework were identified through a comprehensive literature review. According to the nature of BP strategies, the identified IMRCs were classified into three main categories: organization, project, and people. Then, data from 44 case study projects were collected and analyzed. Because information regarding other aspects of these projects, not available through the case study data, was required for this study, a questionnaire was developed and administered to collect additional data about these construction projects. For this purpose, a representative from each project was selected and asked to complete the survey. Finally, 32 significant IMRCs, characterized by 13 attributes, were determined. The project management team (PMT) is typically responsible for preparing the plan, building an effective team, and monitoring the process; therefore, the experience of the PMT in the design and/or construction phase and the number of PMTs who work in a construction project are the most important indicators and contribute the most weight in deriving rework. Next, BPs identified by a construction industry institute were investigated, and among them, 10 BPs were found significantly beneficial for decreasing the cost of rework associated with IMRCs. The implementation of front-end planning determines the feasibility of a project and evaluation of the conceptual scope during the preplanning phase; thus, the design errors due to challenges regarding finance and scope attributes can be decreased with front-end planning. The outcomes of this study may help stakeholders and project managers identify the indicators of rework early in construction projects so they can select the appropriate BP to reduce the costs of rework and improve the project time to completion and cost performance.
    publisherAmerican Society of Civil Engineers
    titleIdentifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction
    typeJournal Paper
    journal volume35
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000669
    page04018060
    treeJournal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian