YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 001
    Author:
    Sharareh Kermanshachi
    ,
    Elnaz Safapour
    DOI: 10.1061/(ASCE)SC.1943-5576.0000460
    Publisher: ASCE
    Abstract: Practitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To address this issue, this research project identified scoping, cost estimation, and risk assessment practices that are implemented nationwide in the early phases of highway and bridge construction projects. A DOT case study was selected for investigating and assessing the current practices, and interviews were conducted with some of the case study DOT districts’ employees. The results were compared with the practices identified in research documents and effective practices, and a gap analysis was performed. Recommendations were developed, and pilot studies of three projects from the case study districts were conducted to examine the effectiveness of the recommendations. The recommendations were structured in five main areas: cost estimating, documentation, risk assessment and contingency calculations, executive policies, and general issues. The results revealed that most of the recommendations had a considerable impact on the case study DOT’s procedures of scoping, cost estimates, and risk assessments. The findings of this research project will help DOTs mitigate cost overruns by accurately defining the project scope, estimating the costs, and assessing the risks of their projects.
    • Download: (1.475Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267516
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorSharareh Kermanshachi
    contributor authorElnaz Safapour
    date accessioned2022-01-30T21:01:18Z
    date available2022-01-30T21:01:18Z
    date issued2/1/2020 12:00:00 AM
    identifier other%28ASCE%29SC.1943-5576.0000460.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267516
    description abstractPractitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To address this issue, this research project identified scoping, cost estimation, and risk assessment practices that are implemented nationwide in the early phases of highway and bridge construction projects. A DOT case study was selected for investigating and assessing the current practices, and interviews were conducted with some of the case study DOT districts’ employees. The results were compared with the practices identified in research documents and effective practices, and a gap analysis was performed. Recommendations were developed, and pilot studies of three projects from the case study districts were conducted to examine the effectiveness of the recommendations. The recommendations were structured in five main areas: cost estimating, documentation, risk assessment and contingency calculations, executive policies, and general issues. The results revealed that most of the recommendations had a considerable impact on the case study DOT’s procedures of scoping, cost estimates, and risk assessments. The findings of this research project will help DOTs mitigate cost overruns by accurately defining the project scope, estimating the costs, and assessing the risks of their projects.
    publisherASCE
    titleGap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment
    typeJournal Paper
    journal volume25
    journal issue1
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000460
    page8
    treePractice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian