YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-6 of 6

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Risk Assessment and Allocation in Highway Construction Projects in the UAE 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
    Author(s): Sameh M. El-Sayegh; Mahmoud H. Mansour
    Publisher: American Society of Civil Engineers
    Abstract: Highway construction projects carry substantial risks. This paper highlights the risks associated with highway construction projects in the United Arab Emirates (UAE). Thirty-three risks are identified through detailed ...
    Request PDF

    Float Consumption Impact on Cost and Schedule in the Construction Industry 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    Author(s): Zafer I. Sakka; Sameh M. El-Sayegh
    Publisher: American Society of Civil Engineers
    Abstract: Quantifying and minimizing the risks associated with delays in the construction industry are the main challenges for all parties involved. Float loss impact in noncritical activities is one of the complicated delays to ...
    Request PDF

    Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 001
    Author(s): Moncer Hariga; Sameh M. El-Sayegh
    Publisher: American Society of Civil Engineers
    Abstract: Resource leveling aims at minimizing the resource usage fluctuations, which is accomplished by moving noncritical activities within their float. The project duration is fixed and is not affected by the leveling. Most of ...
    Request PDF

    Multicriterion Decision-Support Model for Selecting the Appropriate Delivery Method in Sustainable Construction Projects 

    Source: Journal of Architectural Engineering:;2024:;Volume ( 030 ):;issue: 002:;page 04024004-1
    Author(s): Salma Ahmed; Sameh M. El-Sayegh
    Publisher: ASCE
    Abstract: Selecting the appropriate delivery method is of paramount importance, especially in sustainable construction projects that have unique characteristics that are different from their traditional counterparts. A new ...
    Request PDF

    Design–Construction Interface Problems in Sustainable Construction Projects 

    Source: Journal of Architectural Engineering:;2025:;Volume ( 031 ):;issue: 001:;page 04024044-1
    Author(s): Dana Al Qasem; Sameh M. El-Sayegh
    Publisher: American Society of Civil Engineers
    Abstract: The unique demands of sustainable construction projects, necessitating distinct management techniques, specialized materials, and novel building practices, present challenges in efficiently navigating project scope, time, ...
    Request PDF

    Time–Cost Optimization Model Considering Float-Consumption Impact 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 005
    Author(s): Rana A. Al Haj; Sameh M. El-Sayegh
    Publisher: American Society of Civil Engineers
    Abstract: The main objectives of construction projects are completing the project on time and within budget. Typically, there is a trade-off between time and cost. Time loss is costly and time savings can provide benefits to all the ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian