YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Design–Construction Interface Problems in Sustainable Construction Projects

    Source: Journal of Architectural Engineering:;2025:;Volume ( 031 ):;issue: 001::page 04024044-1
    Author:
    Dana Al Qasem
    ,
    Sameh M. El-Sayegh
    DOI: 10.1061/JAEIED.AEENG-1834
    Publisher: American Society of Civil Engineers
    Abstract: The unique demands of sustainable construction projects, necessitating distinct management techniques, specialized materials, and novel building practices, present challenges in efficiently navigating project scope, time, and cost. High cooperation among key stakeholders of sustainable construction projects is considered critical for project success, which is often hindered by design–construction interface problems. These problems arise owing to the increased complexity in the design stage and the diversity of requirements, activities, agents, and tools related to sustainability. While several studies have examined the problems related to the design–construction interface, none has specifically focused on sustainable construction projects. Therefore, this research aims to identify and assess design–construction interface problems in sustainable construction projects. A total of 25 design–construction interface problems were identified through extensive literature review. To assess these design–construction interface problems, a survey was distributed among sustainable construction professionals, where 63 responses were collected. The results of the study indicate that the most significant interface problems in sustainable construction projects include “change orders, lack of proper coordination between various disciplines of the design team, extensive and slow decision-making process, material changes during the construction phase, and poorly written contracts.” Among the provided recommendations, the enhancement of communication and collaboration among the construction parties through the shift toward the integrated project delivery method is emphasized. Communication topped the list of challenges in sustainable construction projects, playing a pivotal role in determining project success. Therefore, interface management, which aims at managing the problems that occur among project stakeholders, becomes even more critical in sustainable construction projects. As many previous studies have shown, a lack of communication between the designer and the contractor hinders the design–construction interface, resulting in creating adversarial relationships, increasing change orders and reworks, and affecting project performance. By identifying, assessing, and mitigating these issues, projects can become more cost-effective and sustainable. Understanding the probability and impact of each problem on project costs allows stakeholders to allocate resources efficiently, reduce delays, and improve overall project performance. This research can inform policy makers and industry professionals about critical areas needing attention, fostering better collaboration between designers and constructors. Ultimately, addressing these interface problems contributes to achieving sustainable development goals.
    • Download: (288.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Design–Construction Interface Problems in Sustainable Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4304316
    Collections
    • Journal of Architectural Engineering

    Show full item record

    contributor authorDana Al Qasem
    contributor authorSameh M. El-Sayegh
    date accessioned2025-04-20T10:15:10Z
    date available2025-04-20T10:15:10Z
    date copyright11/20/2024 12:00:00 AM
    date issued2025
    identifier otherJAEIED.AEENG-1834.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4304316
    description abstractThe unique demands of sustainable construction projects, necessitating distinct management techniques, specialized materials, and novel building practices, present challenges in efficiently navigating project scope, time, and cost. High cooperation among key stakeholders of sustainable construction projects is considered critical for project success, which is often hindered by design–construction interface problems. These problems arise owing to the increased complexity in the design stage and the diversity of requirements, activities, agents, and tools related to sustainability. While several studies have examined the problems related to the design–construction interface, none has specifically focused on sustainable construction projects. Therefore, this research aims to identify and assess design–construction interface problems in sustainable construction projects. A total of 25 design–construction interface problems were identified through extensive literature review. To assess these design–construction interface problems, a survey was distributed among sustainable construction professionals, where 63 responses were collected. The results of the study indicate that the most significant interface problems in sustainable construction projects include “change orders, lack of proper coordination between various disciplines of the design team, extensive and slow decision-making process, material changes during the construction phase, and poorly written contracts.” Among the provided recommendations, the enhancement of communication and collaboration among the construction parties through the shift toward the integrated project delivery method is emphasized. Communication topped the list of challenges in sustainable construction projects, playing a pivotal role in determining project success. Therefore, interface management, which aims at managing the problems that occur among project stakeholders, becomes even more critical in sustainable construction projects. As many previous studies have shown, a lack of communication between the designer and the contractor hinders the design–construction interface, resulting in creating adversarial relationships, increasing change orders and reworks, and affecting project performance. By identifying, assessing, and mitigating these issues, projects can become more cost-effective and sustainable. Understanding the probability and impact of each problem on project costs allows stakeholders to allocate resources efficiently, reduce delays, and improve overall project performance. This research can inform policy makers and industry professionals about critical areas needing attention, fostering better collaboration between designers and constructors. Ultimately, addressing these interface problems contributes to achieving sustainable development goals.
    publisherAmerican Society of Civil Engineers
    titleDesign–Construction Interface Problems in Sustainable Construction Projects
    typeJournal Article
    journal volume31
    journal issue1
    journal titleJournal of Architectural Engineering
    identifier doi10.1061/JAEIED.AEENG-1834
    journal fristpage04024044-1
    journal lastpage04024044-11
    page11
    treeJournal of Architectural Engineering:;2025:;Volume ( 031 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian