YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Float Consumption Impact on Cost and Schedule in the Construction Industry

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    Author:
    Zafer I. Sakka
    ,
    Sameh M. El-Sayegh
    DOI: 10.1061/(ASCE)0733-9364(2007)133:2(124)
    Publisher: American Society of Civil Engineers
    Abstract: Quantifying and minimizing the risks associated with delays in the construction industry are the main challenges for all parties involved. Float loss impact in noncritical activities is one of the complicated delays to assess on a project’s duration and cost. This is due to the fact that the deterministic critical path method cannot cope with such delays unless they exceed the total float values. Further, stochastic analysis, which is used in this research to assess the impact of such delays, is perceived by many planners to be complicated and time consuming. This paper presents a method to control the risks associated with float loss in construction projects. The method uses a recently developed multiple simulation analysis technique that combines the results of cost range estimates and stochastic scheduling, using Monte Carlo simulation. The proposed method quantifies the float loss impact on project duration and cost. Least-squares nonlinear regression is used to convert the stochastic results into a polynomial function that quantifies the float loss impact by relating directly the float loss value to project duration and cost at a specified confidence level.
    • Download: (182.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Float Consumption Impact on Cost and Schedule in the Construction Industry

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26865
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZafer I. Sakka
    contributor authorSameh M. El-Sayegh
    date accessioned2017-05-08T20:46:45Z
    date available2017-05-08T20:46:45Z
    date copyrightFebruary 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A2%28124%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26865
    description abstractQuantifying and minimizing the risks associated with delays in the construction industry are the main challenges for all parties involved. Float loss impact in noncritical activities is one of the complicated delays to assess on a project’s duration and cost. This is due to the fact that the deterministic critical path method cannot cope with such delays unless they exceed the total float values. Further, stochastic analysis, which is used in this research to assess the impact of such delays, is perceived by many planners to be complicated and time consuming. This paper presents a method to control the risks associated with float loss in construction projects. The method uses a recently developed multiple simulation analysis technique that combines the results of cost range estimates and stochastic scheduling, using Monte Carlo simulation. The proposed method quantifies the float loss impact on project duration and cost. Least-squares nonlinear regression is used to convert the stochastic results into a polynomial function that quantifies the float loss impact by relating directly the float loss value to project duration and cost at a specified confidence level.
    publisherAmerican Society of Civil Engineers
    titleFloat Consumption Impact on Cost and Schedule in the Construction Industry
    typeJournal Paper
    journal volume133
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:2(124)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian