YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 18

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Motivational Factors and Challenges of Cooperative Partnerships between Contractors in the Construction Industry 

    Source: Journal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
    Author(s): Murat Gunduz; Ebrahim A. Abdi
    Publisher: ASCE
    Abstract: This work focuses on motivational factors and challenges of cooperative partnering between contractors in the construction industry. The purpose is to identify the main obstacles to forming such relationships and methods ...
    Request PDF

    Critical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 002:;page 04020162
    Author(s): Murat Gunduz; Hesham Ahmed Elsherbeny
    Publisher: ASCE
    Abstract: The success of a project depends on the importance of investigating the impact of contract administration implementation parameters such as response time, approval process, resolving issues, coordination, and documentation. ...
    Request PDF

    Damage to Treasury: Abnormally Low Tenders in Public Construction Works 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2009:;Volume ( 001 ):;issue: 003
    Author(s): Murat Gunduz; Volkan Karacan
    Publisher: American Society of Civil Engineers
    Abstract: The purpose of this paper is to determine the adverse effect of abnormally low tenders (ALTs) on public construction works in Turkey. A comprehensive literature review was performed to investigate the reasons of ALTs. This ...
    Request PDF

    An Adaptive Neurofuzzy Inference System for the Assessment of Change Order Management Performance in Construction 

    Source: Journal of Management in Engineering:;2021:;Volume ( 038 ):;issue: 002:;page 04021098
    Author(s): Khalid K. Naji; Murat Gunduz; Ayman F. Naser
    Publisher: ASCE
    Abstract: Change order management is a major challenge in the construction business due to the associated disputes, claims, productivity losses, delays, and cost implications. As a result, effective change order management (COM) is ...
    Request PDF

    Value Engineering Factors with an Impact on Design Management Performance of Construction Projects 

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003:;page 04022012
    Author(s): Murat Gunduz; Aly A. Aly; Tarek El Mekkawy
    Publisher: ASCE
    Abstract: Design management is one of the most important construction project stages. Identifying the factors that impact a project’s performance is crucial for the overall success of construction projects. This research contributes ...
    Request PDF

    Impact of Change Orders on Small Labor-Intensive Projects 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 005
    Author(s): Awad S. Hanna; Murat Gunduz
    Publisher: American Society of Civil Engineers
    Abstract: In today’s construction, small projects can be just as important if not more important than the larger projects. However, small projects are usually fast track projects, which often involve overlapping design and construction ...
    Request PDF

    Operational Framework for Managing Construction-Contract Administration Practitioners’ Perspective through Modified Delphi Method 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 003
    Author(s): Murat Gunduz; Hesham A. Elsherbeny
    Publisher: ASCE
    Abstract: Effective construction contract administration (CCA) is a core competency for the management of construction projects. The consequences of poor contract administration can be catastrophic, and it may necessitate extensive ...
    Request PDF

    Fuzzy Structural Equation Model to Assess Construction Site Safety Performance 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 004
    Author(s): Murat Gunduz; M. Talat Birgonul; Mustafa Ozdemir
    Publisher: American Society of Civil Engineers
    Request PDF

    Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey 

    Source: Journal of Management in Engineering:;2013:;Volume ( 029 ):;issue: 002
    Author(s): Murat Gündüz; Yasemin Nielsen; Mustafa Özdemir
    Publisher: American Society of Civil Engineers
    Abstract: Construction delays are common in construction industry and create major concerns for project performance. Construction delays are caused by many factors. The aim of this paper is to identify delay factors on construction ...
    Request PDF

    Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects 

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 004
    Author(s): Murat Gunduz; Yasemin Nielsen; Mustafa Ozdemir
    Publisher: American Society of Civil Engineers
    Abstract: The aim of this paper is to propose a decision support tool for contractors before the bidding stage to quantify the probability of delay in construction projects in Turkey by using the relative importance index (RII) ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian