YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Change Orders on Small Labor-Intensive Projects

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 005
    Author:
    Awad S. Hanna
    ,
    Murat Gunduz
    DOI: 10.1061/(ASCE)0733-9364(2004)130:5(726)
    Publisher: American Society of Civil Engineers
    Abstract: In today’s construction, small projects can be just as important if not more important than the larger projects. However, small projects are usually fast track projects, which often involve overlapping design and construction time. Subsequent modifications may be required for the sections that are already under construction. These disruptions to the ongoing project are labeled as change orders. The impact due to changes has been described as the adverse effect upon the unchanged work due to changes in the contract. For this study, 34 projects were selected to develop a statistical model that estimates the amount of labor efficiency lost due to change orders for small projects. The variables in the final model are percent design related changes, percent owner initiated changes, the ratio of actual peak labor to estimated peak labor, the ratio of actual project duration to estimated project duration, and project manager’s percent time on the project. The results of this paper are of value to owners, electrical and mechanical contractors, and construction managers. The model quantifies the impact of change orders by introducing the most important variables that bring the largest disruptions.
    • Download: (133.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Change Orders on Small Labor-Intensive Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/22565
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAwad S. Hanna
    contributor authorMurat Gunduz
    date accessioned2017-05-08T20:39:24Z
    date available2017-05-08T20:39:24Z
    date copyrightOctober 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A5%28726%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22565
    description abstractIn today’s construction, small projects can be just as important if not more important than the larger projects. However, small projects are usually fast track projects, which often involve overlapping design and construction time. Subsequent modifications may be required for the sections that are already under construction. These disruptions to the ongoing project are labeled as change orders. The impact due to changes has been described as the adverse effect upon the unchanged work due to changes in the contract. For this study, 34 projects were selected to develop a statistical model that estimates the amount of labor efficiency lost due to change orders for small projects. The variables in the final model are percent design related changes, percent owner initiated changes, the ratio of actual peak labor to estimated peak labor, the ratio of actual project duration to estimated project duration, and project manager’s percent time on the project. The results of this paper are of value to owners, electrical and mechanical contractors, and construction managers. The model quantifies the impact of change orders by introducing the most important variables that bring the largest disruptions.
    publisherAmerican Society of Civil Engineers
    titleImpact of Change Orders on Small Labor-Intensive Projects
    typeJournal Paper
    journal volume130
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:5(726)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian