YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 004
    Author:
    Murat Gunduz
    ,
    Yasemin Nielsen
    ,
    Mustafa Ozdemir
    DOI: 10.1061/(ASCE)ME.1943-5479.0000261
    Publisher: American Society of Civil Engineers
    Abstract: The aim of this paper is to propose a decision support tool for contractors before the bidding stage to quantify the probability of delay in construction projects in Turkey by using the relative importance index (RII) method incorporated into fuzzy logic. For this purpose, 83 delay factors were identified, categorized into 9 major groups through a detailed literature review process as well as interviews with experts from the construction industry. The relative importance of these delay factors and groups was quantified by using the relative importance index method. The ranking of the factors and groups was demonstrated according to their level of effect on delay. A delay assessment model was proposed using the fuzzy set theory by taking into account the delay factors characterized in construction projects. The assessment model was developed using a commercial software product. The proposed methodology was tested in a real case study; and the probability of the delay of the project was evaluated by means of the assessment model after the required inputs were entered into the software. The factors and groups that contribute most to the probability of delays were discussed depending on the case study results. The assessment model results were found to be satisfactory. Finally, some recommendations were made in order to minimize and control delays in construction projects.
    • Download: (228.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66315
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMurat Gunduz
    contributor authorYasemin Nielsen
    contributor authorMustafa Ozdemir
    date accessioned2017-05-08T21:55:00Z
    date available2017-05-08T21:55:00Z
    date copyrightJuly 2015
    date issued2015
    identifier other%28asce%29mt%2E1943-5533%2E0000011.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66315
    description abstractThe aim of this paper is to propose a decision support tool for contractors before the bidding stage to quantify the probability of delay in construction projects in Turkey by using the relative importance index (RII) method incorporated into fuzzy logic. For this purpose, 83 delay factors were identified, categorized into 9 major groups through a detailed literature review process as well as interviews with experts from the construction industry. The relative importance of these delay factors and groups was quantified by using the relative importance index method. The ranking of the factors and groups was demonstrated according to their level of effect on delay. A delay assessment model was proposed using the fuzzy set theory by taking into account the delay factors characterized in construction projects. The assessment model was developed using a commercial software product. The proposed methodology was tested in a real case study; and the probability of the delay of the project was evaluated by means of the assessment model after the required inputs were entered into the software. The factors and groups that contribute most to the probability of delays were discussed depending on the case study results. The assessment model results were found to be satisfactory. Finally, some recommendations were made in order to minimize and control delays in construction projects.
    publisherAmerican Society of Civil Engineers
    titleFuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects
    typeJournal Paper
    journal volume31
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000261
    treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian