YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 12

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Classification and Analysis of Notice Requirements for Construction Contract Administration 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 003
    Author(s): Mohamed-Asem Abdul-Malak; Salam Khalife
    Publisher: American Society of Civil Engineers
    Request PDF

    Models for the Administration of Structured Construction Contract Notices 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 003
    Author(s): Mohamed-Asem Abdul-Malak; Salam Khalife
    Publisher: American Society of Civil Engineers
    Request PDF

    Considerations for Filing Global Construction Claims: Legal Perspective 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 003
    Author(s): Farah Demachkieh; Salam Khalife; Mohamed-Asem Abdul-Malak; Farook Hamzeh
    Publisher: ASCE
    Abstract: Delays and disruptions that frequently lead to cost overruns on, and late completion of, construction projects are often accompanied by claims for time extensions and/or additional compensations by construction contractors. ...
    Request PDF

    Architect and Engineer’s Spectrum of Engagement under Alternative Delivery Methods: Agreement Negotiation and Formation Implications 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Mayssa Kalach; Mohamed-Asem Abdul-Malak; Issam Srour
    Publisher: ASCE
    Abstract: The proliferation of the several alternatives to the traditional design-bid-build (DBB) project delivery method (PDM), coupled with the ever-increasing demand to reach a faster delivery of construction projects, may commonly ...
    Request PDF

    Legal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author(s): Rayan Assaad; Mohamed-Asem Abdul-Malak
    Publisher: ASCE
    Abstract: The treatment of liquidated damages (LD) and penalty clauses depends on the applicable laws under which the contract is construed. Although many attempts have been contemplated to unify the enforceability standards of LD ...
    Request PDF

    Timing of Liquidated Damages Recovery and Related Liability Issues 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author(s): Rayan Assaad; Mohamed-Asem Abdul-Malak
    Publisher: ASCE
    Abstract: Schedule overruns are persistently observed in the construction industry, and the process of accurately calculating the damages incurred by the injured party is perceived to be burdensome. To overcome that, liquidated ...
    Request PDF

    BIM-Enabled Streaming of Changes and Potential Claims Induced by Fast-Tracking Design-Build Projects 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 001:;page 04520042-1
    Author(s): Mayssa Kalach; Mohamed-Asem Abdul-Malak; Issam Srour
    Publisher: ASCE
    Abstract: Under contractor-led design-build (DB) projects where fast-tracking is commonly exercised, design information may be incompatibly coordinated and pressured to be released prematurely for construction. This potential ...
    Request PDF

    Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 003:;page 04521014-1
    Author(s): Farah Demachkieh; Mohamed-Asem Abdul-Malak
    Publisher: ASCE
    Abstract: Construction project controls is a process that is concerned with attempting to complete the contracted works within the allocated time frame and the preagreed budget, all in accordance with the set quality standards. To ...
    Request PDF

    Avoiding Disputes in PPP Road Contracts: Quantifying Impacts of Increased Allowable Truck Loads 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002:;page 04523003-1
    Author(s): Rana Haj Chhadeh; Ghassan Chehab; Mohamed-Asem Abdul-Malak
    Publisher: American Society of Civil Engineers
    Abstract: Dealing with changes is one major concern in long-term public-private partnerships (PPP) concessions, especially during the implementation phase, as some changes might lead to disputes between PPP partners and disrupt the ...
    Request PDF

    Pivotal New Roles and Changes Introduced by the 2017 FIDIC’s Claim and Dispute Resolution Mechanism 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 001
    Author(s): Mohammad Barakat; Mohamed-Asem Abdul-Malak; Hiam Khoury
    Publisher: ASCE
    Abstract: The inevitable nature of claims and disputes in construction projects necessitates effective administration and resolution mechanisms. To this end, mechanisms stipulated in the standard contract forms in use are frequently ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian