YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 003::page 04521014-1
    Author:
    Farah Demachkieh
    ,
    Mohamed-Asem Abdul-Malak
    DOI: 10.1061/(ASCE)LA.1943-4170.0000481
    Publisher: ASCE
    Abstract: Construction project controls is a process that is concerned with attempting to complete the contracted works within the allocated time frame and the preagreed budget, all in accordance with the set quality standards. To this end, the earned value management (EVM) method is recognized as a well-established technique offering an integrated approach for the efficient monitoring and controlling of the project’s cost and schedule targets during the course of execution. That said, this research aimed at investigating several decision-aid frameworks that can systematically guide the construction contract engineer in making the EVM tool better accustomed and suited for exercising project control and administrating construction contracts, while making use of and benefiting from the enhanced capabilities of the technique that are widely spread in the archived literature. To this effect, the adopted multistep methodology included (1) the verification of the degree of importance of project controls in relation to project success, (2) the classification of the shortcomings reported to be encumbering EVM’s employability as a project controls tool, and (3) the compilation and synthesis of the encountered improvements. The main research outcomes further involved developing several EVM-based frameworks, which shall be of value to the engineer, through stipulating an integrated set of methods and metrics used for (1) checking the analytical schedule-based S-curve submitted by the contractor, (2) dealing with interim payment valuations and certifications, and (3) forecasting and updating the remaining duration for the construction project on hand. Finally, the related requirements to be met by contractors and the types of authority to be entrusted with the engineer are summarized for facilitating the employability of the proposed frameworks, thereby potentially minimizing the likelihood of conflicts and disputes to arise between owners and contractors on construction projects.
    • Download: (4.636Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269794
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorFarah Demachkieh
    contributor authorMohamed-Asem Abdul-Malak
    date accessioned2022-01-31T23:28:48Z
    date available2022-01-31T23:28:48Z
    date issued8/1/2021
    identifier other%28ASCE%29LA.1943-4170.0000481.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269794
    description abstractConstruction project controls is a process that is concerned with attempting to complete the contracted works within the allocated time frame and the preagreed budget, all in accordance with the set quality standards. To this end, the earned value management (EVM) method is recognized as a well-established technique offering an integrated approach for the efficient monitoring and controlling of the project’s cost and schedule targets during the course of execution. That said, this research aimed at investigating several decision-aid frameworks that can systematically guide the construction contract engineer in making the EVM tool better accustomed and suited for exercising project control and administrating construction contracts, while making use of and benefiting from the enhanced capabilities of the technique that are widely spread in the archived literature. To this effect, the adopted multistep methodology included (1) the verification of the degree of importance of project controls in relation to project success, (2) the classification of the shortcomings reported to be encumbering EVM’s employability as a project controls tool, and (3) the compilation and synthesis of the encountered improvements. The main research outcomes further involved developing several EVM-based frameworks, which shall be of value to the engineer, through stipulating an integrated set of methods and metrics used for (1) checking the analytical schedule-based S-curve submitted by the contractor, (2) dealing with interim payment valuations and certifications, and (3) forecasting and updating the remaining duration for the construction project on hand. Finally, the related requirements to be met by contractors and the types of authority to be entrusted with the engineer are summarized for facilitating the employability of the proposed frameworks, thereby potentially minimizing the likelihood of conflicts and disputes to arise between owners and contractors on construction projects.
    publisherASCE
    titleDecision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer
    typeJournal Paper
    journal volume13
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000481
    journal fristpage04521014-1
    journal lastpage04521014-20
    page20
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 013 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian