YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Timing of Liquidated Damages Recovery and Related Liability Issues

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author:
    Rayan Assaad
    ,
    Mohamed-Asem Abdul-Malak
    DOI: 10.1061/(ASCE)LA.1943-4170.0000390
    Publisher: ASCE
    Abstract: Schedule overruns are persistently observed in the construction industry, and the process of accurately calculating the damages incurred by the injured party is perceived to be burdensome. To overcome that, liquidated damages (LD) provisions stipulate a predetermined sum for failure to perform the construction work within the contract’s agreed completion date. While it is recognized that the courts consider the contract language when addressing any contract’s breach, there is a lack of work investigating the collection of LD under standard forms of contract as well as the timing of such recovery. That said, it is still unclear as to when the owner’s right for the recovery of LD from the contractor ripens and can consequently be exercised. Moreover, project owners perceive that LD provisions do not completely cover their delay losses; especially when a recovery limit is stipulated by the contract. To address that, owners search for additional recovery instruments to be used. To this end, the objectives of this paper are as follows: (1) review, compare, and analyze the LD provisions under national and international standard forms of contract; (2) examine the timing of LD recovery and the related liability issues; and (3) explore the different strategies or tools that could be used by the owner to ensure an ultimate recovery of delay damages, the possible interplay among these tools, and the impacts of the different recovery strategies and scenarios. The study contribution lies in advancing a clearer discernment on the LD recovery mechanism in terms of timing and available instruments. As such, the findings of this study help in identifying what may be viewed as the ideal time that owners become entitled to start levying delay damages as well as in deciding on the best recovery tool(s).
    • Download: (1.793Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Timing of Liquidated Damages Recovery and Related Liability Issues

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266021
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorRayan Assaad
    contributor authorMohamed-Asem Abdul-Malak
    date accessioned2022-01-30T19:48:42Z
    date available2022-01-30T19:48:42Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000390.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266021
    description abstractSchedule overruns are persistently observed in the construction industry, and the process of accurately calculating the damages incurred by the injured party is perceived to be burdensome. To overcome that, liquidated damages (LD) provisions stipulate a predetermined sum for failure to perform the construction work within the contract’s agreed completion date. While it is recognized that the courts consider the contract language when addressing any contract’s breach, there is a lack of work investigating the collection of LD under standard forms of contract as well as the timing of such recovery. That said, it is still unclear as to when the owner’s right for the recovery of LD from the contractor ripens and can consequently be exercised. Moreover, project owners perceive that LD provisions do not completely cover their delay losses; especially when a recovery limit is stipulated by the contract. To address that, owners search for additional recovery instruments to be used. To this end, the objectives of this paper are as follows: (1) review, compare, and analyze the LD provisions under national and international standard forms of contract; (2) examine the timing of LD recovery and the related liability issues; and (3) explore the different strategies or tools that could be used by the owner to ensure an ultimate recovery of delay damages, the possible interplay among these tools, and the impacts of the different recovery strategies and scenarios. The study contribution lies in advancing a clearer discernment on the LD recovery mechanism in terms of timing and available instruments. As such, the findings of this study help in identifying what may be viewed as the ideal time that owners become entitled to start levying delay damages as well as in deciding on the best recovery tool(s).
    publisherASCE
    titleTiming of Liquidated Damages Recovery and Related Liability Issues
    typeJournal Paper
    journal volume12
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000390
    page04520015
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian