YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Legal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    Author:
    Rayan Assaad
    ,
    Mohamed-Asem Abdul-Malak
    DOI: 10.1061/(ASCE)LA.1943-4170.0000387
    Publisher: ASCE
    Abstract: The treatment of liquidated damages (LD) and penalty clauses depends on the applicable laws under which the contract is construed. Although many attempts have been contemplated to unify the enforceability standards of LD and penalty provisions, the discrepancies in the principles adopted under different jurisdictions rendered such an aim far from being reached. As such, this paper studies the enforceability of LD and penalty clauses under three jurisdictions: common law, civil law, and Islamic law. The authors reviewed the decision structure under these different jurisdictions, explored the principles governing the enforceability of LD, and compared the jurisdictions’ principles upon which the enforceability of LD and penalty clauses is decided. The findings indicated that many differences exist among these jurisdictions on various levels, including enforceability of these clauses, eligibility to make changes in the predetermined sum, burden of proof, and characteristics pertaining to the liquidated amount. The contribution of this research lies in enhancing the understanding of the considerations governing the levying of LD from a legal point of view rather than from a contractual perspective.
    • Download: (351.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Legal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4266019
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorRayan Assaad
    contributor authorMohamed-Asem Abdul-Malak
    date accessioned2022-01-30T19:48:39Z
    date available2022-01-30T19:48:39Z
    date issued2020
    identifier other%28ASCE%29LA.1943-4170.0000387.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266019
    description abstractThe treatment of liquidated damages (LD) and penalty clauses depends on the applicable laws under which the contract is construed. Although many attempts have been contemplated to unify the enforceability standards of LD and penalty provisions, the discrepancies in the principles adopted under different jurisdictions rendered such an aim far from being reached. As such, this paper studies the enforceability of LD and penalty clauses under three jurisdictions: common law, civil law, and Islamic law. The authors reviewed the decision structure under these different jurisdictions, explored the principles governing the enforceability of LD, and compared the jurisdictions’ principles upon which the enforceability of LD and penalty clauses is decided. The findings indicated that many differences exist among these jurisdictions on various levels, including enforceability of these clauses, eligibility to make changes in the predetermined sum, burden of proof, and characteristics pertaining to the liquidated amount. The contribution of this research lies in enhancing the understanding of the considerations governing the levying of LD from a legal point of view rather than from a contractual perspective.
    publisherASCE
    titleLegal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis
    typeJournal Paper
    journal volume12
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000387
    page04520013
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian