YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Ranking of the Factors Affecting Productivity of Microtunneling Projects 

    Source: Journal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 001
    Author(s): Mohamed Y. Hegab; Ossama M. Salem
    Publisher: American Society of Civil Engineers
    Abstract: The need to provide utility service lines with less disruption to the ground surface has increased the demand for trenchless excavation methods like microtunneling. Although the microtunneling technique has been used in ...
    Request PDF

    Decision Support System for Commencement Delay Claims 

    Source: Practice Periodical on Structural Design and Construction:;2005:;Volume ( 010 ):;issue: 003
    Author(s): Mohamed Y. Hegab; Khaled M. Nassar
    Publisher: American Society of Civil Engineers
    Abstract: Delay claims are common in construction projects. Commencement delay claims are different, as the owner is responsible for the delay. This paper presents a methodology to solve the conflict of a commencement delay event ...
    Request PDF

    Productivity Analysis for Boulac’s Wastewater Microtunnels in Egypt 

    Source: Practice Periodical on Structural Design and Construction:;2004:;Volume ( 009 ):;issue: 002
    Author(s): Mohamed Y. Hegab; Ossama M. Salem
    Publisher: American Society of Civil Engineers
    Abstract: The need for utility service line replacement or repairs with minimum disruption to the surface has increased the demand for trenchless excavation methods like microtunneling. Microtunneling is a trenchless technique that ...
    Request PDF

    Closure to “Developing a Complexity Measure for Project Schedules” by Khaled M. Nassar and Mohamed Y. Hegab 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 003
    Author(s): Khaled M. Nassar; Mohamed Y. Hegab
    Publisher: American Society of Civil Engineers
    Request PDF

    Developing a Complexity Measure for Project Schedules 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 006
    Author(s): Khaled M. Nassar; Mohamed Y. Hegab
    Publisher: American Society of Civil Engineers
    Abstract: Several factors contribute to the complexity of project schedules, including the number of activities, the level of detail, and the shape of the project network. This paper presents a measure that assesses the complexity ...
    Request PDF

    Delay Time Analysis in Microtunneling Projects 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    Author(s): Mohamed Y. Hegab; Gary R. Smith
    Publisher: American Society of Civil Engineers
    Abstract: Delay in microtunneling projects is a complex multivariate problem. Delay in microtunneling is defined as the nonworking time of a microtunneling project due to any reason other than scheduled stops. There are many reasons ...
    Request PDF

    Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    Author(s): Khaled M. Nassar; Walid M. Nassar; Mohamed Y. Hegab
    Publisher: American Society of Civil Engineers
    Abstract: While some projects will experience changes to the contracted cost by deduction or additions, construction cost overruns are becoming a common problem in the construction industry. Steps need to be taken to minimize cost ...
    Request PDF

    Using Weibull Analysis for Evaluation of Cost and Schedule Performance 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 012
    Author(s): Khaled M. Nassar; Hordur G. Gunnarsson; Mohamed Y. Hegab
    Publisher: American Society of Civil Engineers
    Abstract: Large amounts of money are lost each year in the construction industry because of poor schedule and cost control. Few contractors specify and follow systematic schedule monitoring practices. Traditionally, the earned value ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian