YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    Author:
    Khaled M. Nassar
    ,
    Walid M. Nassar
    ,
    Mohamed Y. Hegab
    DOI: 10.1061/(ASCE)0733-9364(2005)131:11(1173)
    Publisher: American Society of Civil Engineers
    Abstract: While some projects will experience changes to the contracted cost by deduction or additions, construction cost overruns are becoming a common problem in the construction industry. Steps need to be taken to minimize cost overrun through cost and quality control techniques. This paper presents a study conducted to evaluate construction cost overruns of asphalt paving operations performed by the Illinois Department of Transportation (IDOT). The main objective is to analyze the main causes of cost overruns and evaluate the amount of cost overrun of asphalt paving operations, using statistical process control (SPC) techniques. Real data from projects in the year 2000 were collected from IDOT. These data contain cost information of 219 projects. The results indicate that the average cost overrun for the sample collected was 4% above the bid price. Reasons for cost overruns are analyzed and a Pareto chart and a cause and effect diagram are constructed. Individuals and Moving Range (MR) control charts are developed and their interpretation and use are discussed. Furthermore, the benefits and limitations of using the individuals and MR chart in cost control applications are pointed out. It is recommended that SPC analysis be an integral part in managing and controlling project costs.
    • Download: (500.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/23187
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKhaled M. Nassar
    contributor authorWalid M. Nassar
    contributor authorMohamed Y. Hegab
    date accessioned2017-05-08T20:40:35Z
    date available2017-05-08T20:40:35Z
    date copyrightNovember 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A11%281173%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23187
    description abstractWhile some projects will experience changes to the contracted cost by deduction or additions, construction cost overruns are becoming a common problem in the construction industry. Steps need to be taken to minimize cost overrun through cost and quality control techniques. This paper presents a study conducted to evaluate construction cost overruns of asphalt paving operations performed by the Illinois Department of Transportation (IDOT). The main objective is to analyze the main causes of cost overruns and evaluate the amount of cost overrun of asphalt paving operations, using statistical process control (SPC) techniques. Real data from projects in the year 2000 were collected from IDOT. These data contain cost information of 219 projects. The results indicate that the average cost overrun for the sample collected was 4% above the bid price. Reasons for cost overruns are analyzed and a Pareto chart and a cause and effect diagram are constructed. Individuals and Moving Range (MR) control charts are developed and their interpretation and use are discussed. Furthermore, the benefits and limitations of using the individuals and MR chart in cost control applications are pointed out. It is recommended that SPC analysis be an integral part in managing and controlling project costs.
    publisherAmerican Society of Civil Engineers
    titleEvaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods
    typeJournal Paper
    journal volume131
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:11(1173)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian