YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Delay Time Analysis in Microtunneling Projects

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    Author:
    Mohamed Y. Hegab
    ,
    Gary R. Smith
    DOI: 10.1061/(ASCE)0733-9364(2007)133:2(191)
    Publisher: American Society of Civil Engineers
    Abstract: Delay in microtunneling projects is a complex multivariate problem. Delay in microtunneling is defined as the nonworking time of a microtunneling project due to any reason other than scheduled stops. There are many reasons for delay such as mechanical failure of system components, leakage of hydraulic hoses, blockage of slurry pipes, and waiting time for excavated materials hauling equipment. Delay time increases the project duration and consequently the project cost. Delay data were collected from 35 microtunneling projects. Collected delay data were delay duration, delay reason, time, and location from the start to the stopping point. Five categories of delay causes were used in the analysis. Prediction of delay time will enhance the estimation accuracy of microtunneling project duration. A predictive model using a probabilistic approach was selected to represent the delay time. Based on data characteristics, a Weibull distribution was determined to best represent the overall delay duration in microtunneling projects. Using “regression with life data,” expected overall delay in a microtunneling project could be predicted as a function of driven length. The model will help contractors to estimate total project time with reasonable accuracy. Knowing the anticipated delay time will allow contractors to have a point of comparison for actual performance.
    • Download: (652.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Delay Time Analysis in Microtunneling Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26942
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamed Y. Hegab
    contributor authorGary R. Smith
    date accessioned2017-05-08T20:46:51Z
    date available2017-05-08T20:46:51Z
    date copyrightFebruary 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A2%28191%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26942
    description abstractDelay in microtunneling projects is a complex multivariate problem. Delay in microtunneling is defined as the nonworking time of a microtunneling project due to any reason other than scheduled stops. There are many reasons for delay such as mechanical failure of system components, leakage of hydraulic hoses, blockage of slurry pipes, and waiting time for excavated materials hauling equipment. Delay time increases the project duration and consequently the project cost. Delay data were collected from 35 microtunneling projects. Collected delay data were delay duration, delay reason, time, and location from the start to the stopping point. Five categories of delay causes were used in the analysis. Prediction of delay time will enhance the estimation accuracy of microtunneling project duration. A predictive model using a probabilistic approach was selected to represent the delay time. Based on data characteristics, a Weibull distribution was determined to best represent the overall delay duration in microtunneling projects. Using “regression with life data,” expected overall delay in a microtunneling project could be predicted as a function of driven length. The model will help contractors to estimate total project time with reasonable accuracy. Knowing the anticipated delay time will allow contractors to have a point of comparison for actual performance.
    publisherAmerican Society of Civil Engineers
    titleDelay Time Analysis in Microtunneling Projects
    typeJournal Paper
    journal volume133
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:2(191)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian