YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Ranking of the Factors Affecting Productivity of Microtunneling Projects

    Source: Journal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 001
    Author:
    Mohamed Y. Hegab
    ,
    Ossama M. Salem
    DOI: 10.1061/(ASCE)PS.1949-1204.0000038
    Publisher: American Society of Civil Engineers
    Abstract: The need to provide utility service lines with less disruption to the ground surface has increased the demand for trenchless excavation methods like microtunneling. Although the microtunneling technique has been used in the United States since 1984, the factors influencing the success of construction process are not completely clear among industry parties. Better understanding of the factors affecting the microtunneling construction process will facilitate enhancing and modeling the productivity of microtunneling projects. A questionnaire was sent to microtunneling experts to study the factors affecting productivity and their ranked importance. The participants are contractors, engineers, and manufacturers in the United States and Canada. This paper presents the results of analyzing the responses of the experts in the microtunneling industry. This research builds up the basics for modeling the microtunneling productivity of microtunneling projects. It will help microtunneling contractors identify the most affecting factors on microtunneling productivity and then building productivity models.
    • Download: (2.501Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Ranking of the Factors Affecting Productivity of Microtunneling Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/67595
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorMohamed Y. Hegab
    contributor authorOssama M. Salem
    date accessioned2017-05-08T21:57:57Z
    date available2017-05-08T21:57:57Z
    date copyrightFebruary 2010
    date issued2010
    identifier other%28asce%29ps%2E1949-1204%2E0000088.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/67595
    description abstractThe need to provide utility service lines with less disruption to the ground surface has increased the demand for trenchless excavation methods like microtunneling. Although the microtunneling technique has been used in the United States since 1984, the factors influencing the success of construction process are not completely clear among industry parties. Better understanding of the factors affecting the microtunneling construction process will facilitate enhancing and modeling the productivity of microtunneling projects. A questionnaire was sent to microtunneling experts to study the factors affecting productivity and their ranked importance. The participants are contractors, engineers, and manufacturers in the United States and Canada. This paper presents the results of analyzing the responses of the experts in the microtunneling industry. This research builds up the basics for modeling the microtunneling productivity of microtunneling projects. It will help microtunneling contractors identify the most affecting factors on microtunneling productivity and then building productivity models.
    publisherAmerican Society of Civil Engineers
    titleRanking of the Factors Affecting Productivity of Microtunneling Projects
    typeJournal Paper
    journal volume1
    journal issue1
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000038
    treeJournal of Pipeline Systems Engineering and Practice:;2010:;Volume ( 001 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian