YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Risk Concession Model for Build/Operate/Transfer Contract Projects 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 002
    Author(s): L. Y. Shen; Y. Z. Wu
    Publisher: American Society of Civil Engineers
    Abstract: This paper extends the build–operate–transfer (BOT) concession model (BOTCcM) to establishing a risk concession model for BOT contract projects. The decision for a concession period is one of the most important decisions ...
    Request PDF

    Design for Green Property Development in Developing Cities 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2013:;Volume ( 139 ):;issue: 004
    Author(s): Vivian W. Y. Tam; L. Y. Shen; Jorge Ochoa
    Publisher: American Society of Civil Engineers
    Abstract: Green property design has been increasingly popular in line with the promotion of sustainable development. While property design in traditional practice has contributed greatly to the improvement of living standards, the ...
    Request PDF

    Alternative Concession Model for Build Operate Transfer Contract Projects 

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004
    Author(s): L. Y. Shen; H. Li; Q. M. Li
    Publisher: American Society of Civil Engineers
    Abstract: This paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor ...
    Request PDF

    ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities 

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    Author(s): H. Li; L. Y. Shen; P. E. D. Love
    Publisher: American Society of Civil Engineers
    Abstract: Artificial neural networks (ANNs) have been applied to support construction mark-up estimation. The major drawback of this application, however, is that an ANN system is unable to explain why and how a particular recommendation ...
    Request PDF

    Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 005
    Author(s): L. Y. Shen; H. J. Bao; Y. Z. Wu; W. S. Lu
    Publisher: American Society of Civil Engineers
    Abstract: This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most important decision ...
    Request PDF

    Awarding Construction Contracts on Multicriteria Basis in China 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 003
    Author(s): L. Y. Shen; Q. M. Li; D. Drew; Q. P. Shen
    Publisher: American Society of Civil Engineers
    Abstract: China’s entry to the World Trade Organization (WTO) will allow both domestic and overseas construction firms to compete under the same market conditions. This development will lead to a more rigorous participation from ...
    Request PDF

    Mapping Approach for Examining Waste Management on Construction Sites 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 004
    Author(s): L. Y. Shen; Vivian W. Y. Tam; C. M. Tam; D. Drew
    Publisher: American Society of Civil Engineers
    Abstract: The increasing awareness of environmental impacts from construction wastes has led to the development of waste management as an important function of construction project management. Various approaches for managing ...
    Request PDF

    Risk Assessment for Construction Joint Ventures in China 

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 001
    Author(s): L. Y. Shen; George W. C. Wu; Catherine S. K. Ng
    Publisher: American Society of Civil Engineers
    Abstract: The construction industry in China is developing toward the international procurement practice, and such development has attracted many foreign firms into the Chinese construction market through the formation of Sino-foreign ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian