YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Alternative Concession Model for Build Operate Transfer Contract Projects

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004
    Author:
    L. Y. Shen
    ,
    H. Li
    ,
    Q. M. Li
    DOI: 10.1061/(ASCE)0733-9364(2002)128:4(326)
    Publisher: American Society of Civil Engineers
    Abstract: This paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits, authorities, and responsibilities between the government and private investors. Previous studies have developed various techniques and methods, mainly suggesting proper organization structure, contracting procedures, methods of project financing, and risk allocation strategies when BOT-contract projects are implemented. These works have provided effective methodologies for the development of BOT contracts. Nevertheless, it appears that little has been undertaken in studying the way to determine the concession period in a BOT contract. This paper critically reviews the principles of establishing the concession period in a BOT contract. Such a review leads to developing a quantitative model for determining a proper concession period that can protect the interests of both the government concerned and private investors. An example is given that indicates how the alternative model can be applied to determine the concession periods of BOT infrastructure projects.
    • Download: (84.69Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Alternative Concession Model for Build Operate Transfer Contract Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20232
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorL. Y. Shen
    contributor authorH. Li
    contributor authorQ. M. Li
    date accessioned2017-05-08T20:34:55Z
    date available2017-05-08T20:34:55Z
    date copyrightAugust 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A4%28326%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20232
    description abstractThis paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits, authorities, and responsibilities between the government and private investors. Previous studies have developed various techniques and methods, mainly suggesting proper organization structure, contracting procedures, methods of project financing, and risk allocation strategies when BOT-contract projects are implemented. These works have provided effective methodologies for the development of BOT contracts. Nevertheless, it appears that little has been undertaken in studying the way to determine the concession period in a BOT contract. This paper critically reviews the principles of establishing the concession period in a BOT contract. Such a review leads to developing a quantitative model for determining a proper concession period that can protect the interests of both the government concerned and private investors. An example is given that indicates how the alternative model can be applied to determine the concession periods of BOT infrastructure projects.
    publisherAmerican Society of Civil Engineers
    titleAlternative Concession Model for Build Operate Transfer Contract Projects
    typeJournal Paper
    journal volume128
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:4(326)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian