YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction 

    Source: Journal of Management in Engineering:;2019:;Volume ( 035 ):;issue: 002
    Author(s): Elnaz Safapour; Sharareh Kermanshachi
    Publisher: American Society of Civil Engineers
    Abstract: Many large-scale construction projects suffer from the issuance of rework that ultimately leads to substantial cost overruns and major scheduling delays. Scholars and practitioners worldwide have assessed the impact of ...
    Request PDF

    Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment 

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 001
    Author(s): Sharareh Kermanshachi; Elnaz Safapour
    Publisher: ASCE
    Abstract: Practitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To ...
    Request PDF

    Exploratory Analysis of Human-, Organizational-, and Project-Based Reworks: Challenges and Strategies 

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001:;page 04521045
    Author(s): Elnaz Safapour; Sharareh Kermanshachi; Piyush Taneja; Apurva Pamidimukkala
    Publisher: ASCE
    Abstract: Reworks are unavoidable during the design and construction phases of construction projects and significantly increase the time and cost required to complete projects. Several studies have been conducted to determine how ...
    Request PDF

    Establishment of Effective Project Scoping Process for Highway and Bridge Construction Projects 

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 002
    Author(s): Sharareh Kermanshachi; Elnaz Safapour; Stuart D. Anderson; Paul Goodrum; Timothy R. B. Taylor
    Publisher: ASCE
    Abstract: The execution of highway and bridge projects commonly subjects state transportation agencies (STAs) to challenges that cause schedule delays and cost overruns. Changes made to the project's scope are critical root causes ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian