YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Establishment of Effective Project Scoping Process for Highway and Bridge Construction Projects

    Source: Practice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 002
    Author:
    Sharareh Kermanshachi
    ,
    Elnaz Safapour
    ,
    Stuart D. Anderson
    ,
    Paul Goodrum
    ,
    Timothy R. B. Taylor
    DOI: 10.1061/(ASCE)SC.1943-5576.0000427
    Publisher: ASCE
    Abstract: The execution of highway and bridge projects commonly subjects state transportation agencies (STAs) to challenges that cause schedule delays and cost overruns. Changes made to the project's scope are critical root causes of these delays and overruns. The main objective of this study is to develop an effective project scoping process (PSP) for highway and bridge construction projects, using the integrated definition (IDEF) modeling technique. To this end, the research team investigated and evaluated the current practices of the PSP by conducting a comprehensive literature review and various in-depth interviews. Three PSPs were developed using the IDEF; then they were analyzed by the research team to select the PSP that best represented key scoping activities and had the highest level of details for further development. The three main functions of the proposed PSP were to select the project, analyze it, and advance the preferred alternative. This process included 20 main activities. This study would assist in the adoption of the most appropriate practices and strategies that lead to mitigating costly scope changes and prevent unnecessary delays for highway and bridge projects.
    • Download: (1.567Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Establishment of Effective Project Scoping Process for Highway and Bridge Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267514
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorSharareh Kermanshachi
    contributor authorElnaz Safapour
    contributor authorStuart D. Anderson
    contributor authorPaul Goodrum
    contributor authorTimothy R. B. Taylor
    date accessioned2022-01-30T21:01:11Z
    date available2022-01-30T21:01:11Z
    date issued5/1/2020 12:00:00 AM
    identifier other%28ASCE%29SC.1943-5576.0000427.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267514
    description abstractThe execution of highway and bridge projects commonly subjects state transportation agencies (STAs) to challenges that cause schedule delays and cost overruns. Changes made to the project's scope are critical root causes of these delays and overruns. The main objective of this study is to develop an effective project scoping process (PSP) for highway and bridge construction projects, using the integrated definition (IDEF) modeling technique. To this end, the research team investigated and evaluated the current practices of the PSP by conducting a comprehensive literature review and various in-depth interviews. Three PSPs were developed using the IDEF; then they were analyzed by the research team to select the PSP that best represented key scoping activities and had the highest level of details for further development. The three main functions of the proposed PSP were to select the project, analyze it, and advance the preferred alternative. This process included 20 main activities. This study would assist in the adoption of the most appropriate practices and strategies that lead to mitigating costly scope changes and prevent unnecessary delays for highway and bridge projects.
    publisherASCE
    titleEstablishment of Effective Project Scoping Process for Highway and Bridge Construction Projects
    typeJournal Paper
    journal volume25
    journal issue2
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000427
    page10
    treePractice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian