• Login
    View Item 
    •   DSpace Home
    • ASME
    • Mechanical Engineering Magazine Select Articles
    • View Item
    •   DSpace Home
    • ASME
    • Mechanical Engineering Magazine Select Articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Underground and Out of Sight

    Thumbnail
    View/Open
    me-2021-mar1.pdf (9.646Mb)
    Date
    2021
    Author
    Kosowatz, John
    Metadata
    Show full item record
    Abstract
    Workers recently finished the last piece of tunnel for Kuala Lumpur’s second metro line, capping a program where autonomous tunneling machines have been operating remotely since 2016. Getting to that point took a poke by a seasoned tunneling director and TBM manager who found an unlikely duo of young, computer savvy, code-writing engineers who brought steering, advancement, excavation, and slurry operations under one operating system.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4276392
    Collections
    • Mechanical Engineering Magazine Select Articles

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV