Underground and Out of SightSource: Mechanical Engineering:;2021:;volume( 143 ):;issue: 002::page 28Author:Kosowatz, John
DOI: 10.1115/1.2021-MAR1Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Workers recently finished the last piece of tunnel for Kuala Lumpur’s second metro line, capping a program where autonomous tunneling machines have been operating remotely since 2016. Getting to that point took a poke by a seasoned tunneling director and TBM manager who found an unlikely duo of young, computer savvy, code-writing engineers who brought steering, advancement, excavation, and slurry operations under one operating system.
|
Collections
Show full item record
| contributor author | Kosowatz, John | |
| date accessioned | 2022-02-05T21:48:53Z | |
| date available | 2022-02-05T21:48:53Z | |
| date copyright | 3/3/2021 12:00:00 AM | |
| date issued | 2021 | |
| identifier issn | 0025-6501 | |
| identifier other | me-2021-mar1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4276392 | |
| description abstract | Workers recently finished the last piece of tunnel for Kuala Lumpur’s second metro line, capping a program where autonomous tunneling machines have been operating remotely since 2016. Getting to that point took a poke by a seasoned tunneling director and TBM manager who found an unlikely duo of young, computer savvy, code-writing engineers who brought steering, advancement, excavation, and slurry operations under one operating system. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Underground and Out of Sight | |
| type | Journal Paper | |
| journal volume | 143 | |
| journal issue | 2 | |
| journal title | Mechanical Engineering | |
| identifier doi | 10.1115/1.2021-MAR1 | |
| journal fristpage | 28 | |
| journal lastpage | 28-6 | |
| page | 6 | |
| tree | Mechanical Engineering:;2021:;volume( 143 ):;issue: 002 | |
| contenttype | Fulltext |