Underground and Out of Sight
| dc.contributor.author | Kosowatz, John | |
| dc.date.accessioned | 2022-02-05T21:48:53Z | |
| dc.date.available | 2022-02-05T21:48:53Z | |
| dc.date.copyright | 3/3/2021 12:00:00 AM | |
| dc.date.issued | 2021 | |
| dc.identifier.issn | 0025-6501 | |
| dc.identifier.other | me-2021-mar1.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4276392 | |
| dc.description.abstract | Workers recently finished the last piece of tunnel for Kuala Lumpur’s second metro line, capping a program where autonomous tunneling machines have been operating remotely since 2016. Getting to that point took a poke by a seasoned tunneling director and TBM manager who found an unlikely duo of young, computer savvy, code-writing engineers who brought steering, advancement, excavation, and slurry operations under one operating system. | |
| dc.publisher | The American Society of Mechanical Engineers (ASME) | |
| dc.title | Underground and Out of Sight | |
| dc.type | Journal Paper | |
| dc.journal.volume | 143 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Mechanical Engineering | |
| dc.identifier.doi | 10.1115/1.2021-MAR1 | |
| dc.journal.fristpage | 28 | |
| dc.journal.lastpage | 28-6 | |
| dc.page | 6 | |
| dc.tree | Mechanical Engineering:;2021:;volume( 143 ):;issue: 002 | |
| dc.contenttype | Fulltext |