contributor author | E. Canuto | |
contributor author | S. Rossetto | |
contributor author | A. Villa | |
date accessioned | 2017-05-08T23:13:47Z | |
date available | 2017-05-08T23:13:47Z | |
date copyright | May, 1982 | |
date issued | 1982 | |
identifier issn | 1087-1357 | |
identifier other | JMSEFK-27696#132_1.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/96084 | |
description abstract | A key problem in transfer line design is that of determining what size should be assigned to intermediate storage buffers in order to maintain a desired production rate despite the imbalances in supply and demand which may arise within the system. In this paper, a deterministic model of production and storage operations of a transfer line, subject to breakdowns and subsequent repair of stations, is presented. Then a simple method, based on the cumulative production curve of each station, for analyzing transfer lines operations is suggested. An extensive use of the method, both numerically and graphically, allows an accurate selection of intermediate storage capacities in the light of guaranteeing the system a stationary mean production rate. | |
publisher | The American Society of Mechanical Engineers (ASME) | |
title | Transfer Lines: A Deterministic Model for Buffer Capacity Selection | |
type | Journal Paper | |
journal volume | 104 | |
journal issue | 2 | |
journal title | Journal of Manufacturing Science and Engineering | |
identifier doi | 10.1115/1.3185808 | |
journal fristpage | 132 | |
journal lastpage | 138 | |
identifier eissn | 1528-8935 | |
keywords | Polishing equipment | |
keywords | Storage | |
keywords | Supply and demand | |
keywords | Design | |
keywords | Maintenance AND Breakdown (Electricity) | |
tree | Journal of Manufacturing Science and Engineering:;1982:;volume( 104 ):;issue: 002 | |
contenttype | Fulltext | |