description abstractUsing turbine deposition models and data from PFBC (pressurized fluidized bed combustion) pilot plant/cascade experiments, deposit buildup rates and turbine maintenance intervals to remove deposits are projected for a PFBC power plant system. The power plant consists of a 10 atmosphere PFB boiler with a matching 10:1 pressure ratio turbine and a gas cleanup system to remove particulates from combustor product gases before entering the turbine. The effects on turbine deposition of three alternative particle cleanup systems are evaluated. Turbine deposit removal intervals to prevent excessive power drops due to deposition are found for the alternative gas cleanup systems.
publisherThe American Society of Mechanical Engineers (ASME)
titleAn Assessment of Deposition in PFBC Power Plant Turbines
typeJournal Paper
journal volume103
journal issue3
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.3230764
journal fristpage552
journal lastpage557
identifier eissn0742-4795
keywordsPower stations
keywordsTurbines
keywordsParticulate matter
keywordsFluidized bed combustion
keywordsCascades (Fluid dynamics)
keywordsDrops
keywordsCombustion chambers
keywordsBoilers
keywordsIndustrial plants
keywordsPressure
keywordsGases AND Maintenance
treeJournal of Engineering for Gas Turbines and Power:;1981:;volume( 103 ):;issue: 003