YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost Estimates for Hydropower at Existing Dams

    Source: Journal of Energy Engineering:;1984:;Volume ( 110 ):;issue: 003
    Author:
    John S. Gulliver
    ,
    Avry Dotan
    DOI: 10.1061/(ASCE)0733-9402(1984)110:3(204)
    Publisher: American Society of Civil Engineers
    Abstract: Guidelines for quick and simple hydropower project cost estimates are developed for preliminary site assessments. The guidelines are based upon a concept which incorporates a single equation utilizing design power and head for total equipment cost and a “site factor” to determine total project cost. Total project cost is estimated by multiplying the equipment cost, obtained from the equation, and the site factor. Total project cost data from a number of hydropower projects are compiled to provide guidelines for choosing the site factor, which is shown to vary greatly, especially for micro
    • Download: (1.417Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cost Estimates for Hydropower at Existing Dams

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/86787
    Collections
    • Journal of Energy Engineering

    Show full item record

    contributor authorJohn S. Gulliver
    contributor authorAvry Dotan
    date accessioned2017-05-08T22:41:43Z
    date available2017-05-08T22:41:43Z
    date copyrightDecember 1984
    date issued1984
    identifier other%28asce%290733-9402%281984%29110%3A3%28204%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86787
    description abstractGuidelines for quick and simple hydropower project cost estimates are developed for preliminary site assessments. The guidelines are based upon a concept which incorporates a single equation utilizing design power and head for total equipment cost and a “site factor” to determine total project cost. Total project cost is estimated by multiplying the equipment cost, obtained from the equation, and the site factor. Total project cost data from a number of hydropower projects are compiled to provide guidelines for choosing the site factor, which is shown to vary greatly, especially for micro
    publisherAmerican Society of Civil Engineers
    titleCost Estimates for Hydropower at Existing Dams
    typeJournal Paper
    journal volume110
    journal issue3
    journal titleJournal of Energy Engineering
    identifier doi10.1061/(ASCE)0733-9402(1984)110:3(204)
    treeJournal of Energy Engineering:;1984:;Volume ( 110 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian