description abstractGuidelines for quick and simple hydropower project cost estimates are developed for preliminary site assessments. The guidelines are based upon a concept which incorporates a single equation utilizing design power and head for total equipment cost and a “site factor” to determine total project cost. Total project cost is estimated by multiplying the equipment cost, obtained from the equation, and the site factor. Total project cost data from a number of hydropower projects are compiled to provide guidelines for choosing the site factor, which is shown to vary greatly, especially for micro
publisherAmerican Society of Civil Engineers
titleCost Estimates for Hydropower at Existing Dams
typeJournal Paper
journal volume110
journal issue3
journal titleJournal of Energy Engineering
identifier doi10.1061/(ASCE)0733-9402(1984)110:3(204)
treeJournal of Energy Engineering:;1984:;Volume ( 110 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record