YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Window Analyses of Compensable Delays

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 002
    Author:
    Michael R. Finke
    DOI: 10.1061/(ASCE)0733-9364(1999)125:2(96)
    Publisher: American Society of Civil Engineers
    Abstract: The identification and analysis of compensable delays become necessary on most construction projects. Although there are several different analytical techniques available, the window method of contemporaneously analyzing delays is the most realistic. The reasons for the superiority of the window method are discussed. The possible results of a window analysis are evaluated and graphically presented. Also discussed are a correction, or intermediate step, in the method, necessary to avoid incorrect findings of false concurrency, and the proper method for handling apportionable and nonapportionable delays. Finally, an argument is made that the burden of proving noncompensable delays, assuming a proper window analysis of compensable delays by a contractor, should be borne by the owner.
    • Download: (91.26Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Window Analyses of Compensable Delays

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85600
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMichael R. Finke
    date accessioned2017-05-08T22:39:53Z
    date available2017-05-08T22:39:53Z
    date copyrightMarch 1999
    date issued1999
    identifier other%28asce%290733-9364%281999%29125%3A2%2896%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85600
    description abstractThe identification and analysis of compensable delays become necessary on most construction projects. Although there are several different analytical techniques available, the window method of contemporaneously analyzing delays is the most realistic. The reasons for the superiority of the window method are discussed. The possible results of a window analysis are evaluated and graphically presented. Also discussed are a correction, or intermediate step, in the method, necessary to avoid incorrect findings of false concurrency, and the proper method for handling apportionable and nonapportionable delays. Finally, an argument is made that the burden of proving noncompensable delays, assuming a proper window analysis of compensable delays by a contractor, should be borne by the owner.
    publisherAmerican Society of Civil Engineers
    titleWindow Analyses of Compensable Delays
    typeJournal Paper
    journal volume125
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1999)125:2(96)
    treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian